Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 10, 2026

Township Council Meeting — Packet

Preserved file SHA-25675e37671f90a719420008509ada2f0a64bcdfd13210ae90c641801425e607e41

Indexed text · page 172

Show all pages
Page 172

Page 4 of 5 Analysis and Recommendations It is our recommendation that stop control be implemented along the northbound, Manger Road approach consistent with Figure 3 below. The installation of a stop sign at the head of the T intersection is consistent with driver expectation and proper sight lines are present. STOP McGuire Drive Figure 3: McGuire Drive & Manger Road STOP Sign Installation Figure 4: Intersection Sight Distance

File revisions (3)