Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 10, 2026

Township Council Meeting — Packet

Preserved file SHA-25675e37671f90a719420008509ada2f0a64bcdfd13210ae90c641801425e607e41

Indexed text · page 439

Show all pages
Page 439

Description Appropriation Authorization Down Payment Useful Life Chestnut Street to the Montclair border, Watchung Avenue from Washington Street to Ridge Avenue and Condit Lane from Watchung Avenue to terminus; all such improvements include, but are not limited to, as applicable, milling, paving, minor drainage and curb ramp replacement; CDBG Grant) Improvements and repairs to the entire lengths or portions of, as applicable, Winfield Street, Virginia Avenue, Kirk Street and Grant Terrace within the Township, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps and driveway aprons; and $ 1,700,000 (including the $392,489 DOT Road Grant $ 1,307,511 $ 0 10 years (iii) Acquisition and installation, as applicable, of EV charging stations and ADA compliant parking spaces at the West Orange Public Library. $ 690,825 (including the $390,000 NJ Clean Fleet Grant) $ 300,825 $ 0 10 years (iv) Section 20 Costs. $ $ 228,000 $12,000 $ 2,121,336 $27,000 (ii) TOTALS: (b) 240,000 $ 3,230,825 The improvements and purposes set forth in Section 3(a) above shall also include, as applicable, all engineering and design work, surveying, construction management services, construction planning, preparation of plans and specifications, permits, bid documents, construction inspection and contract administration, environmental testing and remediation, and all work, materials, equipment, labor and appurtenances necessary therefor or incidental thereto. (c) The estimated maximum amount of bonds or notes to be issued by the Township for said improvements and purposes is $2,121,336. 3 #96344616.2 168182.014

File revisions (3)