Packet · Nov 10, 2026
Township Council Meeting — Packet
75e37671f90a719420008509ada2f0a64bcdfd13210ae90c641801425e607e41Indexed text · page 46
Show all pagesWHEREAS, Rak Plumbing and Heating, LLC, provided a quote, attached hereto as Exhibit “B” in the amount of $75,800.00 to complete the work necessary to install the pump station; and WHEREAS, the scope of work shall include the installation of a pump station that includes a tank with pump, check valves, covers, conduit and associated amenities for an operational station. For the work to be completed, excavation will need to be performed, backfill for trenches, installation of electrical connections and conduit, restoration and topsoil and seeding all disturbed areas; and WHEREAS, the Township Engineer has deemed these repairs necessary to protect the health and safety of residents located on Nelson Court; and NOW, THEREFORE, BE IT RESOLVED, by the Township Council of the Township of West Orange, that Township is authorized to enter into the Temporary Easement and Settlement Agreement in a substantially similar form as attached herein as Exhibit “A” subject to Township Attorney review; and IT IS FURTHER, RESOLVED, that a copy of this Resolution shall be made available in the Clerk’s office in accordance with applicable law. Karen J. Carnevale, R.M.C. Municipal Clerk Susan Scarpa, Council President Adopted: November 10, 2026 I hereby certify funds are available from Account No.: ___ John Ditinyak, Chief Financial Officer 2 03-2984-26-0100-020 $75,800.00
File revisions (3)
- Nov 11, 2026
75e37671f90a17,052,008 bytes - Nov 10, 2026
79ac7b9e4acd16,891,599 bytes - Nov 7, 2026
5bf260b8904517,395,206 bytes