Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 10, 2026

Township Council Meeting — Packet

Preserved file SHA-25675e37671f90a719420008509ada2f0a64bcdfd13210ae90c641801425e607e41

Indexed text · page 88

Show all pages
Page 88

300-26 October 13, 2026 Zayibeth Carballo, PE Municipal Engineer Township of West Orange 25 Lakeside Avenue West Orange, NJ 07052 SUPPLEMENTAL A/E SERVICES PROPOSAL FOR: Interior Alterations for Restrooms Improvements Second Floor Tenant 10 Rooney Circle, West Orange, NJ A. PROJECT DESCRIPTION 1. Herbst-Musciano, LLC will include the following in the project documents: a. Check water pressure and function of existing pressure reducing valve. b. Replace existing WCs and Urinals completed with flush valves. c. Removal and replacement of ceramic floor tile. d. Clothing hanger rods for men's shower area. e. Countertop trash opening and trash bin f. Secure restroom supply storage. g. New GFIC outlet receptacles at men's and women's vanities. B. ARCHITECTURAL DESIGN SERVICES 1. CONSTRUCTION DOCUMENTS PHASE i. Include the above items in the contract drawings and specs C. COMPENSATION 1. A fixed fee payable monthly in proportion to services rendered, with overall lump sum fee attributed generally as follows: Task 2. Staff Architect Est. ManHrs 16 MEP Engineer Plumber Av. Hourly Rate Fee $ 175 2,800. 12 200 2,400. 4 250 1,000. Notes Man-Hrs are for reference only Man-Hrs are for reference only Check water pressure and regulator TOTAL SERVICES $ 6,200. Billing shall be made monthly in proportion to services rendered and payment is appreciated within 30 days of date of invoice. I hope that this is acceptable. Please contact me if you have any questions. Sincerely, Gary Musciano, AIA, PP HERBST-MUSCIANO, LLC Architecture & Planning New Jersey Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, New Jersey 07005 Tel 973 538 3815 Fax 973 538 4095 www.herbstmusciano.com

File revisions (3)