Packet · Nov 10, 2026
Township Council Meeting — Packet
75e37671f90a719420008509ada2f0a64bcdfd13210ae90c641801425e607e41Indexed text · page 88
Show all pages300-26 October 13, 2026 Zayibeth Carballo, PE Municipal Engineer Township of West Orange 25 Lakeside Avenue West Orange, NJ 07052 SUPPLEMENTAL A/E SERVICES PROPOSAL FOR: Interior Alterations for Restrooms Improvements Second Floor Tenant 10 Rooney Circle, West Orange, NJ A. PROJECT DESCRIPTION 1. Herbst-Musciano, LLC will include the following in the project documents: a. Check water pressure and function of existing pressure reducing valve. b. Replace existing WCs and Urinals completed with flush valves. c. Removal and replacement of ceramic floor tile. d. Clothing hanger rods for men's shower area. e. Countertop trash opening and trash bin f. Secure restroom supply storage. g. New GFIC outlet receptacles at men's and women's vanities. B. ARCHITECTURAL DESIGN SERVICES 1. CONSTRUCTION DOCUMENTS PHASE i. Include the above items in the contract drawings and specs C. COMPENSATION 1. A fixed fee payable monthly in proportion to services rendered, with overall lump sum fee attributed generally as follows: Task 2. Staff Architect Est. ManHrs 16 MEP Engineer Plumber Av. Hourly Rate Fee $ 175 2,800. 12 200 2,400. 4 250 1,000. Notes Man-Hrs are for reference only Man-Hrs are for reference only Check water pressure and regulator TOTAL SERVICES $ 6,200. Billing shall be made monthly in proportion to services rendered and payment is appreciated within 30 days of date of invoice. I hope that this is acceptable. Please contact me if you have any questions. Sincerely, Gary Musciano, AIA, PP HERBST-MUSCIANO, LLC Architecture & Planning New Jersey Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, New Jersey 07005 Tel 973 538 3815 Fax 973 538 4095 www.herbstmusciano.com
File revisions (3)
- Nov 11, 2026
75e37671f90a17,052,008 bytes - Nov 10, 2026
79ac7b9e4acd16,891,599 bytes - Nov 7, 2026
5bf260b8904517,395,206 bytes