Town CrierWest Orange, New Jersey
← Back to search

Agenda · Jul 19, 2022

Township Council Meeting — Agenda

Preserved file SHA-256aa1af5e8eac5568959638c449baed02459185a13b24b356b32798ca4f39a65ee

Indexed text · page 136

Show all pages
Page 136

Via Email July 7, 2022 09022.1011 Mr. Leonard R. Lepore, Municipal Engineer Municipal Engineer/Director of Public Works Township of West Orange 25 Lakeside Avenue West Orange, New Jersey 07052 Re: Ginny Duenkel Pool Improvements PS&S Proposal for Engineering Services Dear Mr. Lepore: Paulus, Sokolowski and Sartor, LLC (PS&S) is pleased to submit this proposal to provide professional engineering services to the Township of West Orange for design, construction documentation, bid review, and construction administration services for certain improvements to the West Orange Ginny Duenkel township pool. We understand the main pool has a footprint of approximately 9,500 square feet. An adjacent wading pool covers approximately 1,600 square feet but is not subject of this proposal. 1.0 SCOPE OF SERVICES In accordance with recent correspondence, we understand that the Township desires to have certain improvements made to the Ginny Duenkel Main pool. These improvements include replastering and painting of the pool surface, and replacement of existing deck drains with a new larger drain. PS&S proposes to provide the following professional engineering services in support of this project: A. Review of pool construction plans and previous studies/documents associated with prior pool investigations/repairs. B. Perform a field visit to confirm/verify existing conditions at the site. C. Design and specifications for the replastering and painting of the pool surfaces and the replacement of the existing pool deck drain with a larger drain. D. Provide twelve (12) sets of bid documents. E. Provide construction administration services including review and processing of contractor submittals (shop drawings, samples, etc.), response to RFI’s, and contractor payment requisition submissions. PS&S assumes a total of up to two (2) site visits during the entire construction period anticipated to be two months.

File revisions (1)