Town CrierWest Orange, New Jersey
← Back to search

Agenda · Jul 19, 2022

Township Council Meeting — Agenda

Preserved file SHA-256aa1af5e8eac5568959638c449baed02459185a13b24b356b32798ca4f39a65ee

Indexed text · page 137

Show all pages
Page 137

Township of West Orange Page 2 Ginny Duenkel Pool Improvements July 7, 2022 2.0 ASSUMPTIONS AND EXCLUSIONS We assume the following in our proposal: 1. Structural repairs/modifications to the pool are not anticipated/included. 2. The design/technical specifications are anticipated to be on the drawings, and that book specifications are not required. 3. All Application and Permit fees will be paid by Township of West Orange. 4. Full time or daily site visits during construction period is not required and not included in the proposal. 3.0 SCHEDULE PS&S will commence work within five (5) days of authorization to proceed and estimates up to three (3) weeks to complete the design, specifications, and bid documents. The bid document review time by the Township of West Orange DPW is not included in the Schedule. 4.0 FEE, TERMS, AND CONDITIONS PS&S proposes to provide the aforementioned Scope of Services for a LUMP SUM fee of Ten Thousand Three Hundred Dollars ($10,300.00) as broken down below. These fees exclude any permit fees, which will be paid directly by the Township of West Orange. These services would be performed in accordance with the terms and conditions of the attached PS&S Schedule of Charges & Hourly Rates and General Conditions of Service both dated February 1, 2022. Fee Breakdown Phase 010 – Design $6,500.00 Phase 020 – Construction Administration $2,800.00 Phase 990 – Expenses (printing, mail, mileage) $1,000.00 Total $10,300.00

File revisions (1)