Town CrierWest Orange, New Jersey
← Back to search

Agenda · Sep 15, 2022

September 15, 2022 Regular Meeting

Preserved file SHA-256aa0d1d5b2edc24d3619b85de6e0bc43a1286c9c4d5c1d2ea6d5811702009c2ce

Indexed text · page 3

Show all pages
Page 3

Buffer-Report Elevations-Sheet-A-1-Dated-1-13-2022 Elevations-Sheet-A-2-Dated-1-13-2022 First-Floor-As-Built-Plan-A-3-Dated-1-13-2022 Plg-Dir-Memo-ZB-22-01---Siju Proposal-Letter-Dated-1-13-2022-from-C-Dougherty-Architect Proposed-Addition-and-Alterations-Existing-Residence-Dated-1-13-2022 Second-Floor-As-Built-Plan-A-4-Dated-1-13-2022 Siju-Zoning-submission-set---Plans-Dated-1-13-2022 Tree-Removal-Application Verification-of-Taxes Zoning-Submission-Cover-Sheet---C1-Dated-1-13-2022 Application ZB 22-01 Camera Construction Contract Dated 11/15/2020 Subpoena Camera Construction Dated June 15, 2022 Subpoena Camera Construction personally- Dated June 15, 2022 ZB-22-01 Siju - Original Submitted Construction Plans Architectural Submission Dated 7/8/2022 Survey 200- Lorelei Road Dated 11/16/2021 Application 7/8/2022 Resubmission Arch Drawing Dated 8/14/2020 Planning Director Memo- Siju updated 7/18/2022 20 orelei- Building Dept 2.) ZB 21-01 M Vega Investments LLC/66 Franklin Avenue (Carried from 8/18/2022) 66 Franklin Avenue Block: 134.02; Lot: 75.03, 79, 81; Zone: B-1 Seeking “c” and “d” variances for modifications to property with mix of uses. Application & Original Submission (w Planning Report Dated 12-22-2020) Property Survey (Dated June 28, 2021) Traffic Assessment Report (Dated September 24, 2021) Preliminary & Final Site Plan Set 9/24/2021 SPRAB Report (Dated February 9, 2021) West Orange Planning Board (Site Plan Submission (Dated - September 20, 2021) Planning Director's Memo (Dated November 24, 2021) Traffic and Parking Assessment Report Cover Letter Traffic and Parking Assessment Report Revised 12/3/2021 Zoning Board Engineer Review #1 (Dated 12-8-2021) Preliminary/Final Major Site Plan (Dated - January 7, 2022) Stormwater Management Statement (Dated January 7, 2022) Summary of Approvals and Permits (Dated-January 6, 2022) Summary of Requested Relief (Dated- January 6, 2022) Cover Later (Dated January 7, 2022) Town Engineer- Review #2 (Dated- January, 18, 2022) Planning Director Memo (Updated January 28, 2022) Consent to Continuance Dated 2/14/2022 Consent to Continuance 4/19/2022

File revisions (1)