Supporting Documentation · Date unavailable
PB-24-08 GBSJ, LLC t/a Goddard School - B: 83 L: 1 Z B-2
cd481814f775d726475b946b61a16805403c6be2ff0ed290ec45f0b48e5650ffIndexed text
10. 11. public hearing, all exhibits introduced by the Applicant, and all terms and conditions of this resolution. The Applicant shall pay all outstanding application fees and technical review fees, board attorney fees for preparation of the resolution, as well as any inspection fees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of the notification or this approval shall be deemed withdrawn. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. Applicant agrees to abide by all of the suggestions and directives set forth in the Hess reports dated May 16, 2024 and July 3, 2024. Applicant will reduce the size of the building by 60square feet to be identical to the square footage proposed in the first application and correct the site plan to show that there are 70 required parking spaces on site. Applicant shall install and maintain in perpetuity, native plantings with the approval of the Township Forester. An additional “Watch for Pedestrian” sign before the crosswalk on the north side will be added. Signs (other than those directional signs required in the parking lot or for traffic control as mentioned herein) will be mounted on the building and will comply with the Township Ordinance. The trash enclosure will located in the southwest corner. {Goddard School Draft Resolution - PB 24-08 (new)}11
12: 13, 14. 15. 16. 17. The new building shall have a white/energy efficient roof. Applicant must submit proof of approval of the facility from the Division of Children and Family Services to the Zoning Official. (This is not a condition precedent to the signing of plans, associated construction or a Certificate of Occupancy.) Applicant will look to reconfigure the roof access by looking at their Livingston site to see if a larger/safer roof entrance can be accommodated. An AED device shall be located on each floor of the building. Fire Lane/"no parking” striping shall be added as determined by the Fire Official. The Applicant shall list all conditions of approval onto a final site plan submission prior to the submission of the building permit. The undersigned secretary certifies the decision set forth herein was made by this Board on July 10, 2024, and memorialized herein pursuant to N.J.S.A. 40:55D10(g) on July 30, 2024. Jamilet Baqfieri Plannii oard Secretary {Goddard School Draft Resolution - PB 24-08 (new)}12
Vote Action Taken by the Board on July 10, 2024: Board Motion | Second Aye Nay Abstain Absent Member K. Alper Pitas J. Guarino L.Klein fo S. McCartney >< J. McNair C. Morgan b-- P. Smeraldo 4 W. Wilkes S. Jensen J. Cardoza P6 [P< [P< P< [P< R. Bagoff Xx Vote on Memorialization on July 30, 2024: Board Member | Motion [Second Aye Nay Abstain Absent K. Alper [>< J. Guarino Xx L.Klein L-- S. McCartney Xx J. McNair 4 C. Morgan = P. Smeraldo = W. Wilkes = S. Jensen J. Cardoza | >< >< R. Bagoff x {Goddard School Draft Resolution - PB 24-08 (new)} 13
File revisions (1)
- Sep 29, 2026
cd481814f7755,965,110 bytes