Supporting Documentation · Date unavailable
PB-24-08 GBSJ, LLC t/a Goddard School - B: 83 L: 1 Z B-2
cd481814f775d726475b946b61a16805403c6be2ff0ed290ec45f0b48e5650ffIndexed text · page 5
Show all pages16. 17. 18. 19. 20. 2. 22. 23. 24. As was required in the first application, a new crosswalk is proposed across the site driveway closest to Marcella Avenue to connect the two buildings. The trash enclosure will be placed at the southwest corner. The consolidated lots (Lot 1) have a total lot area of 5,344 square feet (1.34 acres). The application was previously reviewed by the Site Plan Review Advisory Board (“SPRAB”) for the first application and the Applicant addressed nearly all of the issues raised at the SPRAB meeting through revised and supplemental application materials with the exception of concern raised about cleanup of trash discarded from passing vehicles. Applicants testified that they would continue to maintain and remove the trash that is littered by passing vehicles. To improve drainage and stormwater runoff, the new curbing on Marcella Avenue and new walkways will be installed. Also, the property will be graded to properly direct runoff and additional landscaping (60 shrubs, 2 trees and perennial plants) is proposed which will also aid in disbursement of the stormwater. 500 square feet of new impervious coverage is being added to the site. As was agreed to in the first application, Applicant will install “Watch for Pedestrian” signs to alert drivers as they approach the crosswalk from both Marcella Avenue direction as well as from the northerly direction. The only signs will be on the building and will comply with the Township ordinance. While there is a generator currently located on Lot 1, it will be relocated to an area to be approved by the Building Department. {Goddard School Draft Resolution - PB 24-08 (new)}5
File revisions (1)
- Sep 29, 2026
cd481814f7755,965,110 bytes