RESOLUTION Township of West Orange Planning Board PB 24-08 GBSJ, LLC t/a Goddard School/ 289 Mount Pleasant Avenue Block: 83 Lots: 1; Zone: B-2 Decided on July 10, 2024 Memorialized on July 30, 2024 Application for Preliminary and Final Major Site Plan Approval with Bulk Variances to Expand the Existing Childcare Center, Demolish an Existing Building and Construct a New Building WHEREAS, GBSJ, LLC t/a Goddard School (Hereinafter the “Applicant”) has made an application for Preliminary and Final Major Site Plan approval with Variances to expand the existing childcare center at property located at 289 Mount Pleasant Avenue, also known as Block: 83; Lots 1 (the “Property”), in the B-2 commercial zone; and WHEREAS, a properly noticed public hearing was conducted on July 10, 2024; and WHEREAS, the Applicant was represented by Walter E. Hanley, III, Esq.; and WHEREAS, the Applicant provided testimony from Steven Harrison, owner and operator of GBSJ, LLC t/a Goddard School, Gerard P. Gesario, PE of Jarmel Kinzel, as a professional engineer, and Cheryl Schweiker, AIA of Jarmel Kizel, as a professional architect; and WHEREAS, the Applicant submitted the following documents to the Board in the form of the application package: ITEM SIGNED BY DATE/REVISION Site Plan (10 sheets) Gerard P. Gesario, P.E. 4/1/2024 Architectural Plans (2 sheets) Matthew B. Jarmel, AIA, 4/2/2024 MBA Survey of Property James Pica, PLS of P2 Land 3/7/2024 Survevine Inc {Goddard School Draft Resolution - PB 24-08 (new)}

Page 2

WHEREAS, representatives of the public were provided with an opportunity to pose questions of the Witnesses and also had an opportunity to offer statements in regard to the Application; and WHEREAS, the Board reviewed and considered the Application and the documents submitted therewith, the testimony of the Witnesses and members of the public; and WHEREAS, the Board having previously granted site plan approval and identical variances to rehabilitate an existing building in the same location as the proposed building at a hearing on November 1, 2023 which was memorialized in a resolution on November 29, 2023 for the matter docketed as PB-23-10; WHEREAS, the Board also considered the testimony and filed review letters of its professionals at the hearing, including review memos dated May 16, 2024 and July 3, 2024 from John J. Hess, P.E., PP, CME (Township Engineer) and a Planner’s Report by Gerard M. Haizel, PP, AICP, Principal of Nishaune Group, Township Planning Consultant dated may 12, 2024. NOW THEREFORE, the Board makes the following findings of fact, based upon the evidence presented at its public hearing, at which a record was made: 1. The Applicant is requesting approval for Preliminary and Final Major site plan approval with c variances to expand the existing childcare center by demolishing an existing building on site and building a new building in the same footprint as previously approved in the resolution memorialized on November 29, 2023 (the “first application”) located on property recently merged with Lot 1 (previously known as lot 5.01). Ds As required in the first application, the two properties previously designated as Lots 1 and 5.01, were consolidated as Lot 1. {Goddard School Draft Resolution - PB 24-08 (new)}2

Page 3

The Planning Board approved an application in 2017 to permit the existing school. The subject property is located on the northeastern corner of the intersection of Mt. Pleasant Avenue and Prospect Avenue. The area surrounding the subject property is developed with a mix of land uses which include office, retail, residential and utility. An electrical substation is located to the west across Prospect Avenue, the Essex County Country Club is located to the southwest and a large vacant parcel is located to the south across Mount Pleasant Avenue. Offices are located along Marcella Avenue, Mount Pleasant Avenue and Prospect Avenue. Communications towers and ancillary facilities are located on properties along Marcella Avenue. Other commercial uses are located along Prospect Avenue. The subject property is located at the intersection of two main roads: Mount Pleasant Avenue and Prospect Avenue. Mount Pleasant Avenue is a County road (Route 577) adjacent to the subject site and is a State highway to the west of Prospect Avenue (Route 10), while Prospect Avenue is a County road (also Route 577 north of Mount Pleasant Avenue). A childcare center is located on Lot 1, along with a metal transmission tower and related improvements. Existing site improvements include an 8,800 square foot, one-story building and a 5,600 square foot outdoor fenced-in play area on the northeastern portion of the site (adjacent to Marcella Avenue.) A total of 45 parking spaces are currently provided in two parking lots, an upper lot at the same elevation as the building, and a lower lot accessed by a driveway and stairs. {Goddard School Draft Resolution - PB 24-08 (new)}3

Page 4

10. 11. 13; 14. 15, Twenty-two (22) spaces are located in the upper parking lot and the remaining parking spaces are in the lower parking lot. Vehicular access to the site is provided by right-in, right-out access driveway on Mount Pleasant Avenue and a two-way driveway on Marcella Avenue. The existing childcare center on former lot 5.01 was approved by the Planning Board in 2017 and has been operating for six (6) years. Lot | is developed with a three-story building and multiple radio transmission towers (Which are currently in operation.) Two radio towers on the building to be demolished will be removed as their leases have ended (and will not be replaced) and a building will be removed as part of this application. The towers on the west side will remain. The Applicant is requesting approvals to build a new building on Lot 1 to serve as an annex to the existing childcare center. The proposal is to build a new building in the identical location, size and with the same setbacks and number of classrooms as recently approved by the Board in the first application. Three classrooms would be located within the new building, one on each floor. The total capacity of the classrooms would remain at 60 children as previously approved. There will be no change to the traffic pattern from the first application approved by the Board. An elevator and two stairways are proposed to be added to comply with the applicable codes and regulations. The proposed new building is a safer and better design for use as a childcare center as the classrooms will not have support beams inside the classrooms and the exterior will be complementary to the existing building as an aesthetic improvement. {Goddard School Draft Resolution - PB 24-08 (new)}4

Page 5

16. 17. 18. 19. 20. 2. 22. 23. 24. As was required in the first application, a new crosswalk is proposed across the site driveway closest to Marcella Avenue to connect the two buildings. The trash enclosure will be placed at the southwest corner. The consolidated lots (Lot 1) have a total lot area of 5,344 square feet (1.34 acres). The application was previously reviewed by the Site Plan Review Advisory Board (“SPRAB”) for the first application and the Applicant addressed nearly all of the issues raised at the SPRAB meeting through revised and supplemental application materials with the exception of concern raised about cleanup of trash discarded from passing vehicles. Applicants testified that they would continue to maintain and remove the trash that is littered by passing vehicles. To improve drainage and stormwater runoff, the new curbing on Marcella Avenue and new walkways will be installed. Also, the property will be graded to properly direct runoff and additional landscaping (60 shrubs, 2 trees and perennial plants) is proposed which will also aid in disbursement of the stormwater. 500 square feet of new impervious coverage is being added to the site. As was agreed to in the first application, Applicant will install “Watch for Pedestrian” signs to alert drivers as they approach the crosswalk from both Marcella Avenue direction as well as from the northerly direction. The only signs will be on the building and will comply with the Township ordinance. While there is a generator currently located on Lot 1, it will be relocated to an area to be approved by the Building Department. {Goddard School Draft Resolution - PB 24-08 (new)}5

Page 6

255 26. 27. 28. 29. The Board took notice of the resolution from the first application that there are 132 students at the school with a long waiting list and 25 faculty members. 80% of the faculty use mass transportation to get to the site. The Board also took notice of the resolution from the first application that parents dropping and picking up their children are on site an average of 7 minutes and the drop off and pick up times are staggered through the day beginning at 7:30AM and through to 9:30AM with most drop offs arriving between 8:30 and 9:00AM. There are half day students picked up in the afternoon and from 3:00PM to 6:00PM, students are picked up with most being picked up between 5-5:30PM. The Board also took notice of the resolution approving the first application that at peak drop off and pick up times only half of the currently existing parking spaces (45) are used and while it is anticipated that 60 additional students will be in the new building annex, testimony from Applicant’s traffic engineer was that a conservative estimate would anticipate the use of approximately 33 vehicles on site at any peak time which can easily be accommodated by the existing conditions. If the parking were increased it would result in additional impervious coverage. The Board did not re-review potential Electric vehicle charging stations as they took notice and accepted the findings set forth in the resolution for the first application that EV charging stations are not recommended because as the facility is a school, parent parking all day is not permitted and there are few faculty members that use the parking lot. Additionally, as this is a secure site being a school, therefore, EV parking spaces are not open for public parking for security purposes. {Goddard School Draft Resolution - PB 24-08 (new)}6

Page 7

30. 31. The current plans show 60 additional square feet to the building from the first application (which would increase the required parking from 70 parking spaces in the first application to 71 parking spaces); however, Applicant will amend the design to reduce that additional square footage so that it is identical to the square footage in the first application (and thus have a 70 parking space requirement.) The Application requires the following variance relief from the Board: SECTION/REQUIREMENT PERMITTED/REQUIRED PROPOSED 25.71 Minimum front yard 30 feet 12.5 feet 25-7.1 Minimum side front yard 25 feet 3.0 feet 25-7.1 Maximum lot coverage 60% 67% 25-12.2b.1 Minimum number of parking spaces 70 spaces (as per the proposed amended design) 45 spaces 325 N.J.S.A. 40:55D-46a. and b. and N.J.S.A. 40:55D-50a. govern the Board’s review of the preliminary and final site plan application. N.J.S.A. 40:55D-46a provides that an “ordinance requiring site plan review and approval shall require the developer submit to the administrative officer a site plan and such other information as is reasonably necessary to make an informed decision as to whether the requirements necessary for preliminary site plan approval have been met.” N.J.S.A. 40:55D-46a further provides that “The site plan and any engineering documents to be submitted shall be required in tentative form for discussion purposes for preliminary approval. If any architectural plans are required to be submitted for site plan approval, the preliminary plans and elevations shall be sufficient.” N.J.S.A. 50:55D-46b provides that “if the planning board required any substantial amendment in the layout of improvements proposed by {Goddard School Draft Resolution - PB 24-08 (new)}7

Page 8

33. the developer that have been the subject of a hearing, an amended application for development shall be submitted and proceeded upon, as in the case of the original application for development” and “the planning board shall, if the proposed development complies with the ordinance and this act, grant preliminary site plan approval.” N.J.S.A. 40:55D-50a. provides that final site plan approval “shall” be granted if the detailed drawings, specifications, and estimates of the application conform to the standards of all applicable ordinances and the conditions of preliminary approval. As such if the applicant meets the standards set forth in the ordinances, the planning board lacks the authority to deny approval of the site plan and subdivision. N.J.S.A. 40:55D-50a; PRB_Enters., Inc. _v. S. Brunswick Planning Bd., 105 N.J. 1, 7 (1987); Dunkin' Donuts of N.J., Inc. v. Twp. of N. Brunswick Planning Bd., 193 N.J. Super. 513, 515 (App. Div. 1984). Conversely, if the application does not comply with all ordinance requirements, the Board must deny approval. Cortesini v. Hamilton Planning Board, 417 N.J. Super. 201, 215 (App. Div. 2010). However, there are two exceptions: (1) The first exception is where an application does not comply with all ordinance requirements but the Board grants relief in terms of variances or exceptions. In that case, the Board then must review the application against all remaining ordinance requirements and grant approval if the application complies with all such remaining requirements. N.J.S.A. 40:55D-60 permits a planning board to grant variances from the bulk regulations of a zoning ordinance and other zoning deviations that do not require a “d” variance as part of site plan or subdivision review. The variance proofs are the same as for “c” variances as set forth in N.J.S.A. 40:55D-70. A c (2) variance may be granted {Goddard School Draft Resolution - PB 24-08 (new)}8

Page 9

when the purposes of zoning are advanced and the benefits of deviating from the ordinance requirements outweigh any detriments. The benefits derived from granting a “c (2)” variance must include benefits to the community as a whole, not just the applicant or property owner A “c” variance must address the “negative criteria,” and affirmatively demonstrate that the variance can be granted “without substantial detriment to the public good” and “without substantial impairment to the intent and purpose of the zone plan and zoning ordinance” of the municipality. NOW, THEREFORE, based upon the foregoing findings of fact, the Board reaches the following conclusions of law: 1. The use at the site is both a permitted use and an inherently beneficial use. 2. The requested variances for minimum front yard, minimum side front yard and maximum lot coverage satisfy the ¢ (1) criteria as they are pre-existing conditions which are hardships caused by the property and as to the lot coverage the improvements to landscaping and curbing will improve the conditions on site. The requested parking variance satisfies the c (2) criteria because the project as a whole advances the purpose of the MLUL as it is inherently beneficial and also will be an aesthetic improvement due to the removal of non-permitted uses (communication towers) and also is an encouraged use under the Master Plan. 4. The benefits of the project outweigh any negatives. NOW THEREFORE BE IT RESOLVED by the Planning Board of the Township of West Orange that approval for Preliminary and Final Major site plan approval with c variances to {Goddard School Draft Resolution - PB 24-08 (new)}9

Page 10

expand the existing childcare center by modifying and expanding an existing building on an adjacent property is granted; and IT IS FURTHER RESOLVED that the approval granted to GBSJ, LLC t/a Goddard School, is subject to the following terms and conditions: 1. The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations, and directives, including without limitation, obtaining all applicable local, state, and federal approvals, or permits. If another governmental entity or agency grants a waiver or a variance affecting the plans and/or exhibits submitted by the Applicant, this approval or the conditions attached to it, then the Applicant shall re-apply to this Board respecting the same and this Board shall have the right to view that issue as it relates to this approval and these conditions and modify and amend same, if appropriate. 2. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those municipal regulations for which change is prohibited by the Municipal Land Use Law (MLUL), or in the event Applicant or its successor or assigns construct or attempt to construct any improvement in conflict with or in violation of the terms of this approval, the Board hereby reserves the right to withdraw, amend or supplant the instant approval. 3. All construction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the {Goddard School Draft Resolution - PB 24-08 (new)}10