Town CrierWest Orange, New Jersey
← Back to search

Agenda · Mar 19, 2026

March 19, 2026, Regular Meeting

Preserved file SHA-256f9d2d17ac1642745f7e72368cabc01cabf9132be65d40fe6ffe4b9abb27ecc48

Indexed text · page 2

Show all pages
Page 2

2 F. SWEARING IN Township Professional(s) G. MINUTES • February 19, 2026, Regular Meeting H. ANNUAL REPORT I. RESOLUTIONS • ZB-24-15 Waystone Realty LLC (Approved 2/19/2026) 42 Eagle Ridge Way Block: 106; Lot: 24.01; Zone: R-1; Application for Preliminary and Final Major Site Plan Approval with D Variances was approved with conditions at the February 19, 2026, Regular Meeting. • ZB-25-02 Montclair Stables LLC (Approved 2/19/2026) Block: 152.02; Lot:176,179, & 186 ; Zone: R-1, R-5, B-5, 12-22 Woodland Avenue Application for Preliminary and Final Site Plan Approval with C and D Variances was approved with conditions at the February 19, 2026, Regular Meeting. J. APPLICATIONS 1.) ZB-24-17 Pardo Development Group Inc. (Carried from 1/15/2026) 104 Winding Way Block: 46.01; Lot: 33 Application for C Variance Boundary-and-Topographic-Survey---104-Winding-Way CME-25-02-13---Review-1 Cover-Letter---104-Winding-Way Ownership-Disclosure---104-Winding-Way 104-Winding-Way---ZB-24-17---Completeness-Memo---January-28-2025 104-Winding-Way---ZB-24-17---Planning-Review-REV1--April-7-2025 Proof-of-Taxes-Paid---104-Winding-Way Variance-Plan---104-Winding-Way---R1 Zoning-Board-Application---104-Winding-Way Supplemental-Statement---104-Winding-Way Tree-Removal-and-Replacement-Application---104-Winding-Way Noticing-Docs-dated-5-20-2025-and-rcd-6-2-2025 Affidavit-of-Publication 2020-014-Pardo-Development-West-Orange-NJ---20241030---Board-Submission (rcd 6- 11-25) Letter-to-CRE-Review (rcd 11-7-2025) Resubmission-Cover-Letter-11625 (rcd 11-7-2025) 104-Winding-Way-Tree-Survey-Table-Plot (rcd 11-7-2025) 20251104---104-Winding-Way-Variance-Plan---R2 (11-7-2025) Prior-Resolution-of-Denial (rcd 11-10-2025) Resubmission-Cover-Letter-11725 (rcd 11-10-2025) ZB-24-17 Pardo (104 Winding Way) - Forester Memorandum Dated 11-13-25 (rcd 11- 14-2025) 11-13-2025-Email-from-PSules-re-Forester-Memo-rcd-11-14-2025 11-14-2025 Pardo---CME-Planning-Review-1 (rcd 11-17-2025) 11-17-2025-Engineering-Review-2 (rcd 11-18-2025)

File revisions (1)