Town CrierWest Orange, New Jersey
← Back to search

Minutes · Sep 17, 2026

September 17, 2026, Regular Meeting

Preserved file SHA-256f4e6287c16c3bdb0ad3e158ba14f448bc9d95a688c127fcd6b76503895c17d32

Indexed text · page 3

Show all pages
Page 3

Motion: Chairperson Neuer Second: R. Miller Barbee: : Schwarzbaum: - Ben-Zvi (Alt.): - Scott: Y Cohen: Y Sussman (Alt.): - Dannemiller (Alt.): Y Weiss: - Dubovy (Alt.): = Neuer: Y Miller: Y APPLICATIONS 1.) ZB-26-02 Rhode 13 Porter Road Block: 175.24 ; Lot: 3; Zone: R-6 Application for C Variance for building addition. PRESENTATION e Mr. Karriem Rhode, Applicant/Owner entered the record. He was sworn under oath and explained his intentions for his garage. He elaborated that he and his wife purchased this property in April of 2026 where they are seeking approval to build a 200 square foot addition to the back of the house which would extend to the garage and add on a master bathroom as well as a walk in closet. e° Mr. Rhode confirmed that he received the September 11, 2026 Memorandum from Municipal Engineer, Ms. Zayibeth Carballo and that his professionals Mr. Richard Volmar, Engineer and Aaron Gonzalez, Architect will address those items. e Mr. Richard Volmar, Engineer entered the record was sworn under oath, and after providing his credentials was accepted as an expert in the field of Engineering. He confirmed that he has worked on projects of this size/scope and that he reviewed the September 11, 2026 Memorandum from Municipal Engineer, Ms. Zayibeth Carballo. He then went through the memo stating that: e Clarified no tree removal is proposed; existing vinyl fence protects adjacent trees. e Addressed technical memorandum from township engineer identifying areas of concern, particularly: e Steep slope disturbance: Approximately 35 sq ft of building footprint impacts slopes over 25%, technically requiring a variance since the ordinance prohibits disturbance over 25% slopes. e Stormwater management: Although not triggered by the addition size, the applicant is proactively installing a Coltec underground stormwater detention system to mitigate erosion and improve drainage, capturing runoff far exceeding regulatory thresholds. e Explained that grading work will soften an otherwise steep slope to a safe, walkable gradient, thereby enhancing site stability. © Stormwater System Details: e Coltec units are shallow (approx. 4 ft deep), plastic chambers allowing infiltration without clogging or significant maintenance. e Soil permeability assumptions were conservative; soil test results will be submitted post-construction.

File revisions (1)