Minutes · Sep 17, 2026
September 17, 2026, Regular Meeting
f4e6287c16c3bdb0ad3e158ba14f448bc9d95a688c127fcd6b76503895c17d32Indexed text · page 5
Show all pagese Mr. Dubovy followed up by asking about “Potability” being a big issue in determining whether these things can handle. In worst case scenario calculations, so just trying to get a sense of how much water these things will be able to handle and at what point the capacity will be exceeded. Mr. Vomer answered stating that they are adding 200 square feet of impervious area. which equates to 200 square feet of impervious area with capturing almost 1,000 square feet from the roof. So, there's that much water that's not going to be allowed to disperse across the property. However, those chambers can actually hold up to 1,056 square feet of runoff with this particular intensity of a storm. In that unlikely event, certainly it would be a much more intense storm than what it's designed for as the ordinance requires us to design for 3 inches per square foot. If on the chance that these systems do fill up, it'll back up to the storage in the pipe that leads to it. The pipe is going to be perforated so there can be more for the 30 feet that it takes to get there, with holes in that pipe, and that water can perk into the ground all along, but if it fills up, it's going to overflow onto a splash block, improving from the present condition. Where right now, there's just a little elbow on the roof leader for it to spill out. Unquestionably making the current situation better with the design that's put forth on the plan. NO PROFESSIONALS QUESTIONS NO PUBLIC QUESTIONS PRESENTATION Mr. Aaron Gonzalez, AIA entered the record again and confirmed that he is still under oath. Mr. Gonzalez testified to the improvements proposed and the mini excavator that was proposed to work in this tight space. He estimated that excavation may take 3 days and testified that they will not rush it, they will be careful in this tight space. He agreed that the regrading of the ground at the corner and the “Cultec” were better than a swale to address stormwater and keep water from the foundation. Mr. Gonzales also testified that the addition squares of the corner at the back of the home and does not go further into the side yard than the existing home. The relief requested is for 16 inches, 1.04 feet, side yard setback variance. The Board discussed the application and agreed that a swale was not needed, that the fence protects the trees, and that the Applicant and his professionals did a good
eet, side yard setback variance. The Board discussed the application and agreed that a swale was not needed, that the fence protects the trees, and that the Applicant and his professionals did a good job presenting the application NO BOARD QUESTIONS NO PROFESSIONALS QUESTIONS NO PUBLIC QUESTIONS NO PUBLIC COMMENT CONDITIONS e This approval shall be subject to all requirements, conditions, restrictions and limitations set forth in all prior governmental approvals, to the extent that same are not inconsistent with the terms and conditions set forth herein. e The Applicant shall comply with all Federal, State, County and Township statutes, ordinances, rules, regulations and requirements affecting development in the Township, County, and State, including but not limited to Essex County Planning Board, and Hudson Essex Soil Conservation District requirements.
File revisions (1)
- Oct 20, 2026
f4e6287c16c33,153,830 bytes