Town CrierWest Orange, New Jersey
← Back to search

Minutes · Sep 17, 2026

September 17, 2026, Regular Meeting

Preserved file SHA-256f4e6287c16c3bdb0ad3e158ba14f448bc9d95a688c127fcd6b76503895c17d32

Indexed text · page 6

Show all pages
Page 6

e The Applicant shall be bound by all the evidence, including documents and testimony presented by the Applicant at the Public Hearing. e The Applicant shall obtain all required building permits from the Township prior to the start of construction. e The Applicant shall pay all outstanding taxes, fees, escrows and deposits due and owing to the Board and the Township prior to the issuance of building permits. e This approval is based upon the site plans submitted with the Application. The Applicant shall revise those plans to comply with the comments in the Township Engineer’s Report dated, September 11, 2026 including revised steep slope tables, signature block, and stormwater notes prior to the adoption of the Resolution of approval for this application. Except that a swale, an operation manual for the stormwater improvements, tree protection plan and tree replacement plan shall not be required. No blasting shall be permitted for this project. The Applicant’s Engineer shall supervise a percolation test, which may be done at the time of construction, in lieu of providing an operations and maintenance manual for the stormwater system. The test results shall be reviewed to the satisfaction of the Township Engineer. e Inaddition, the Applicant’s Engineer shall provide an as built plan and shall certify that the stormwater system was installed as designed and that the stormwater calculations are accurate prior to the issuance of a certificate of occupancy. e Pursuant to Sections 25-48.10(a) and 25-48.10(c), of the Ordinance, the variance relief granted by the Board and identified herein shall expire within two (2) years and one (1) day from the date of publication of a notice of the granting of such relief in either the official newspaper of the Township of West Orange or a newspaper of general circulation in the Township, unless, before the expiration of said two (2) year and one (1) day period, either (i) a building or construction permit is secured and issued or (ii) the actions authorized hereby have been commenced; and e These Conditions shall be clearly printed on the engineering drawings submitted for filing in the official records of the Board. Motion: Chairperson Neuer Second: W.M. Barbee Barbee: Y Schwarzbaum: y Ben-Zvi (Alt.): - Scott: ¥ Cohen: Y Sussman (Alt.): = Dannemiller (Alt.): Y Weiss: Y Dubovy (Alt.): - Neuer: Y Miller: Y Prior to

Page 6

tion: Chairperson Neuer Second: W.M. Barbee Barbee: Y Schwarzbaum: y Ben-Zvi (Alt.): - Scott: ¥ Cohen: Y Sussman (Alt.): = Dannemiller (Alt.): Y Weiss: Y Dubovy (Alt.): - Neuer: Y Miller: Y Prior to the Break, Ms. Lisa John-Basta, Esq. entered the record on behalf of ZB-25-07 Mavis to ask for an adjournment to the October 29, 2026, Special Meeting with preservation of notice and confirmed that no testimony would be heard this evening. She also confirmed to the

File revisions (1)