iment.to the efficiency and functionality of the overall site. He said the proposed loading arrangement was considered the more prudent and practical design solution. Mr. Dean discussed the EV spaces and stated that the applicant would comply with the applicable requirements. He referenced a 2024 DCA clarifying memo and explained that, as he read it, only new parking spaces were required to meet the EV percentage. Mr. Dean stated that because the applicant was effectively scraping the site clean and building from scratch, it would comply with the applicable EV requirement rather than debate whether the percentage applied to total parking or only new parking. Mr. Dean stated that he believed the requirement was two EV spaces for a total commercial parking supply between 50 and 100 spaces. He said the applicant would provide those spaces, with one needing to be available for disabled individuals. Mr. Dean stated that the EV spaces were a matter of code compliance and that the final requirements would be dictated by the Building Department. Mr. Dean noted that the applicant understood that the Fire Department generally does not want EV spaces immediately alongside the building, and the EV spaces would therefore be located where acceptable to the divisions of the Town having oversight. Mr. Dean stated that the plan showed four EV spaces in the central infield parking area and that one would need to be accessible to ADA users. Mr. Dean clarified that an EV space does not have to be signed as a handicapped space, but must be available and accessible to disabled individuals. He explained that a person 22
in an EV who is not disabled could park in the space without receiving a handicapped parking violation, provided that the space remains accessible to those individuals. Ms. Amanda C. Wolfe asked Mr. Dean to address the parking calculation and whether he concurred that the project provided sufficient parking. Mr. Dean stated that there had been discussion with the TRC regarding the parking calculation. He explained that the mezzanine area is not customer accessible and is arguably not retail. Mr. Dean stated that if only the ground-floor retail area were considered, without the upper floor, the project would comply with the required parking. In his opinion, the upstairs inventory and employee lounge do not independently generate additional parking demand. Mr. Dean explained that under the ordinance there is a waiver for the first 1,000 square feet, followed by a requirement of one parking space per 300 square feet. Based on that calculation, the requirement would be 57 spaces for the entire approximately 18,000- square-foot building, conservatively assuming that the entire upper floor is retail. Mr. Dean stated that the fundamental question was whether the plan provided sufficient parking. Based on the walkability of the neighborhood, the location, and the fact that the second floor was included to minimize the footprint and maximize parking, he said that, in his professional opinion as a traffic engineer, he was confident that the project would provide sufficient parking for the neighborhood. Mr. Dean stated that he did not believe the applicant would make this level of investment in cleaning up the site if the project would not provide adequate parking for its customers. Mr. Dean noted that Main Street provides on-street parallel parking, including a number of spaces across the project frontage, as well as parking along Irwin. He emphasized that these spaces would be available but would not be exclusively available to the site. Mr. Dean stated that, in his opinion, for the downtown setting, the project has an appropriate off-street parking supply and, in combination with the surrounding neighborhood, there is sufficient parking for the proposed use. Ms. Wolfe asked Mr. Dean to discuss pedestrian safety and the potential options for addressing pedestrian concerns, including the constraints associated with those options. Mr. Dean stated that they had
. Wolfe asked Mr. Dean to discuss pedestrian safety and the potential options for addressing pedestrian concerns, including the constraints associated with those options. Mr. Dean stated that they had spent considerable time reviewing the access scheme and attempting to devise the safest arrangement for pedestrians. Mr. Dean explained that having separated ingress and egress driveways was safer than the current configuration, which had existed for approximately 30 years or more. Mr. Dean explained the proposed apron design. He stated that, unlike the large curved radii at Irwin or Prospect, the proposed design uses an apron where the sidewalk elevation remains fixed. Mr. Dean stated that the apron design gives priority to pedestrian movements, with vehicles becoming subordinate because they must travel up a small ramp when entering or leaving the site. Mr. Dean explained that pedestrians continuing toward Irwin would encounter handicap ramps and detectable warning pads, allowing individuals to continue south across Irwin or north across Prospect. Mr. Dean noted that Irwin and Prospect do not currently have painted crosswalks across Main Street, and stated that this condition is endemic to the site and exists irrespective of the current application. Mr. Dean stated that if the Town Engineer believed that striped crosswalks would be an appropriate mitigation for increased pedestrian and vehicular traffic, and if the County concurred, the applicant would be willing to install striped crosswalks wherever they were considered warranted or preferred. 23
Mr. Dean explained that there are challenges associated with driveways on the opposite side of Main Street. He stated that he would not recommend a crosswalk at the location south of Kling Street because most vehicles turning from Kling Street turn left, and he did not want to introduce a crosswalk into conflict with Kling Street traffic. Mr. Dean suggested that a crosswalk north of the project's entrance driveway, on the north side of Kling Street, could provide better visibility because it would be located at an intersection. Mr. Dean stated that the applicant was willing to contribute toward whatever location was determined to be the best place for the crosswalks. BOARD QUESTIONS Chairman Bagoff noted that the upstairs area contains 5,810 square feet and asked about the size of the employee ceriter and kitchenette within that area. Mr. Dean confirmed the existence of the employee area but deferred to Jorge regarding its exact size, stating that it was not a large area and was probably identified on the plans. Mr. Dean reviewed the mezzanine floor plan and identified 4,144 square feet of storage area on the second floor. Chairman Bagoff asked whether approximately half of the 13,934 square feet of retail space could be considered counter space. Mr. Dean explained the calculation, stating that the first-floor retail area contains 13,934 square feet. Because the ordinance does not require parking for the first 1,000 square feet, the remaining 12.934 square feet were calculated at a ratio of one space per 300 square feet, resulting in a requirement of 43 spaces. Mr. Dean stated that the project has 44 on-site striped parking spaces. Mr. Dean further explained that, under the FV credits, the project receives a four-space credit, ‘representing 10 percent, bringing the calculated total to 48 spaces. Chairman Bagoff referenced the Board's parking ordinance, Section 25-12.2B.1, and stated that he believed it called for one parking space per 250 square feet rather than one per 300 square feet, while acknowledging that he could be mistaken. Mr. Dean stated that he had spent considerable time reviewing the ordinance and determined that the B1/CBD zone has a different parking standard. He explained that he had asked the Board's prior planner, Paul Greigel, where the CBD map was located, and after receiving the map, confirmed that the property is within the CBD.
ent parking standard. He explained that he had asked the Board's prior planner, Paul Greigel, where the CBD map was located, and after receiving the map, confirmed that the property is within the CBD. That was the basis for using the one- space-per-300-square-feet parking standard. Chairman Bagoff stated that, when the Board considers the parking calculation, a significant amount of the first-floor square footage will consist of counter space and space for customers purchasing items, while the upstairs area primarily involves a much smaller employee-use area. Council President Scarpa asked what times of day deliveries would be made, expressing concern about Main Street during rush hour. Mr. Dean deferred to Ms. Wolfe and noted that the delivery hours were already shown on the plan and had been addressed at a prior hearing. Chairman Bagoff asked Mr. Dean to clarify the total number of parking spaces that would be provided. Mr. Dean initially stated that he believed there were 44 striped spaces. o Ms. Wolfe clarified that there were 48 proposed spaces, four of which were EV spaces that receive the EV parking credit. Chairman Bagoff asked how many spaces were ADA spaces. Mr. Dean stated that there were two ADA spaces, but clarified that if every physical space on the site were counted, there would be 44 spaces. Mr. Dean explained that the 44 physical spaces include the four EV spaces and two ADA spaces. 24
Mr. Klein asked about the delivery hours shown in the traffic report and site plan. He stated that the traffic report showed the temporary loading space from 7:00 a.m. to 11:00 a.m., while the plan set appeared to show 7:00 a.m. to 12:00 a.m., which would indicate midnight, and requested clarification. Ms. Wolfe clarified that the intended hours were 7:00 a.m. to 12:00 noon. Mr. Klein asked whether the applicant would then need to go to the Mayor and Council to obtain the ordinance establishing the restriction. Mr. Dean confirmed that this was correct. Mr. Klein raised a clarification concerning the proposed bump-out at the corner. He stated that it was shown on one drawing but not on the engineering site plans and asked whether any drainage calculations would be affected. Mr. Dean stated that the area is impervious in the existing condition and would be a combination of impervious and pervious area in the proposed condition. Mr. Dean explained that the bump-out is within the public right-of-way and would therefore require permission from the Mayor and Council and/or the County. Mr. Dean stated that treatments such as rain gardens could potentially be introduced and that the applicant had agreed to construct the treatment in whatever design was most receptive to the community, similar to the approach discussed for the crosswalk. Mr. Klein asked whether the proposed treatment was simply a pavement treatment or whether it would include a raised curb or other physical feature. Mr. Dean stated that he believed it would be curbed, but noted that there were concerns regarding fire access. Mr. Dear stated that the exact treatment would be reviewed with Mr. Valesi or his associates, the County, and the Town Engineer. Chairman Bagoff asked where the fire lanes would be located and whether areas would be marked for fire trucks. Mr. Dean stated that fire trucks would pull in where they need to, whether on Main Street or in the parking lot. He stated that the area behind the parking space could be striped as a fire lane/no parking area, or crosshatch striping could be used in the aisle itself. Ms. Kapferer asked about the proposed bump-outs and whether they would consist of paint and bollards, and whether the county had been consulted and was open to the proposal. Mr. Dean stated that the bump-outs had been discussed with David Antonio in the county planning
d consist of paint and bollards, and whether the county had been consulted and was open to the proposal. Mr. Dean stated that the bump-outs had been discussed with David Antonio in the county planning office. Mr. Dean clarified that the exhibit was an illustrative example and not necessarily what would ultimately be installed. He stated that the applicant did not want to design the streets for the Board, but was committed to making them safer as a result of the application, with the specific treatment to be determined. Ms. Kapferer-asked whether the county had been consulted about a potential crosswalk north of Kling or in the vicinity of the project, and whether a rectangular rapid flashing beacon (RRFB) had been discussed. Mr. Dean stated that an RRFB had not been specifically discussed because the idea came up after the initial discussions with the county. He stated that he did not believe rapid flashing beacons were necessarily appropriate at every intersection and that they should be used where there is a demonstrated need. Ms. Kapferer asked about the distance from the southern end of the loading area to Irwin and noted the concept of daylighting and the need for visibility at an intersection. Mr. Dean stated that the design provides more than 25 feet of distance and that the bump-out was also intended to provide additional visibility. Ms. Kapferer asked about the duration and frequency of use of the temporary parking/loading area during the stated 7 a.m. to noon period. Mr. Dean stated that he expected the space to be used for approximately 20 minutes to a half hour at a time to remove partial truckloads. 25:
- Ms. Kapferer asked about circulation, signage, and striping to ensure that drivers understand where to enter and exit. Mr. Dean stated that there would be a combination of signing and striping. He stated that, if there is favorable action and the project proceeds to resolution compliance, there would be very conspicuous "do not enter" and "entrance only" signage, while avoiding excessive clutter. Mr. Dean stated that signing and striping would be used throughout the entire parking lot, including flow arrows similar to those shown on the plan, with additional arrows added so that internal circulation would be obvious and conspicuous. - Chairman Bagoff noted that the 2025 Professional Planner's report stated that deliveries on Main Street would occur from 7 a.m. to 11 a.m., rather than until noon, and asked whether noon represented a change from the original proposal. Mr. Dean confirmed that noon was a change from the original proposal. PROFESSIONAL QUESTIONS - Mr. Davis asked whether off-site parking had been considered, noting that the BI zone permits off-site parking on properties within 250 feet. Mr. Dean testified that the issue had been discussed during the TRC, including a suggestion that the large CVS lot down the street could be considered. He deferred to Ms. Wolfe regarding whether it had been successfully considered and stated that he did not believe there was anything else available within 250 feet. He noted that the neighborhood is fairly well developed and does not contain a lot of empty space. - Mr. Davis asked about the two employee parking spaces that require variances because vehicles accessing them have to back out into the right-of-way at Prospect Place. Mr. Dean testified that the spaces were designated for employees to limit turnover. An employee would leave the vchicle there for the workday, approximately eight hours, rather than having frequent customer turnover. Mr. Dean testified that, in his opinion, the employee spaces were not at variance with other on-street parking along Prospect, where neighboring residents back in and out of their driveways. - Mr. Valesi asked whether Mr. Dean would be able to provide turning movements for emergency vehicles that may have to circulate through the parking lot. Mr. Dean stated that an ambulance would fit through the site and that a fire truck would have access. He stated that a fire truck
emergency vehicles that may have to circulate through the parking lot. Mr. Dean stated that an ambulance would fit through the site and that a fire truck would have access. He stated that a fire truck may not be able to loop all the way around, but in an emergency, everything would shut down, including Main Street and the parking lot, and emergency apparatus would come in as needed. Mr. Dean clarified that trucks were not intended to freely circulate through the parking lot, but the site would be accessible to emergency vehicles. - Mr. Valesi asked about a potential conflict shown on the turning movement plan between a passenger car and the parallel parking space and also identified an apparent conflict involving the truck and the parallel parking space when turning into the loading space. Mr. Dean stated that he would provide a template demonstrating that the truck would not clip the parking space. - Mr. Valesi asked about the loading zone on Irwin Place and noted a vehicle shown on street view along the curb line across the street, as well as signage for alternate side parking area. Mr. Valesi asked whether deliveries could be scheduled so there would be no chance of a vehicle being parked in that location. Mr. Dean deferred to counsel, stating that such a commitment would come from the applicant rather than the traffic expert. o Ms. Wolfe stated that the matter would need to be discussed further. 26
o Mr. Dean stated that it was a reasonable suggestion to ensure that the truck could get in and out and testified that deliveries would be confined to the hours when parking was prohibited. Mr. Valesi noted that, if the bump-out were constructed with a physical curb line, the drainage structures shown on the survey would have to be considered by the site plan engineer, including the possibility of relocating structures. Mr. Dean agreed and stated that the inlets would need to be addressed if they were impacted by the bump-out design. Mr. Valesi asked for a sight distance triangle showing a vehicle leaving the parking lot and turning either left or right, in addition to the sight distance triangle already shown for the loading space. Mr. Dean agreed to provide the additional sight distance information and stated that the situation was no different from what exists today, but that it would be placed on a plan so it would be evidenced. PRESENTATION Mr. Jorge Mastropietro entered on the record and confirmed that he was still under oath from the prior hearing. He testified to the following: Mr. Mastropietro addressed a question regarding rain gutters and explained that the construction documents had not yet been started because the applicant would not begin that phase until approval was obtained. Mr. Mastropietro testified that the building design contemplated hiding the rain gutters so that they would not be visible from Main Street. He showed an illustrative image, Exhibit A4, of a building where the gutters are concealed. Mr. Mastropietro stated that the other roof drainage would be within the roof and ceiling cavity so that nothing would be exterior. o He explained that the intent was to design a beautiful building without visible gutter downspouts or similar exterior elements. Mr. Mastropietro discussed the proposed lighting and stated that the applicant was considering LED strip lights running around the building, including along the other side. Regarding landscaping, Mr. Mastropietro stated that rain gardens were being considered and that the civil plans identify low planting for the exit sight triangle where vehicles leave the parking lot, so that visibility is maintained. Mr. Mastropietro stated that the information concerning the proposed trees is contained in the civil and landscaping plans. Mr. Mastropietro stated that the bench had not been