Supporting Documentation · Date unavailable
225-10 Attachment
d4bfb9a199fc3b49aabcf16dec5e1580929bae8084c15883447fa424968899c0Indexed text
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation TYPE OF IMPROVEMENT Infrastructure Purpose Bikeway Primary project purpose is for constructing new bikeways (e.g. bike lanes, bike paths, bike compatible roadways). Bridge Preservation Primary project purpose is for improving the condition of Bridge infrastructure (e.g. new deck, rehabilitation, replacement). Mobility Primary project purpose is to enhance mobility and reduce congestion (e.g. adding lanes, park & ride, signal optimization). Pedestrian Safety Primary project purpose is to enhance pedestrian safety (e.g. new sidewalks, new crosswalks, traffic calming, pedestrian overpass). Quality of Life Primary project purpose is for beautification, environmental mitigation, economic development or historic preservation. ✔ Roadway Preservation Primary project purpose is for improving the condition of roadway infrastructure (e.g. resurfacing, reconstruction, drainage). Roadway Safety Primary project purpose is to enhance vehicular safety (e.g. guide rail, signing, warning devices, striping).
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation Project Name Note: If you have multiple locations for the same type of improvement and scope of work, you may enter “various” for the project limits, download an excel spreadsheet, fill it out and attach it below. Project Title: Belle Terre Road and Roosevelt Avenue Improvement Project From: Pleasant Valley Way and Belle Terre Road To: Coolidge Avenue and Lincoln Avenue Project Distance (Miles): 0.3
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation PROJECT LOCATION County to filter by: Essex County Municipalities: West Orange Town Township
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation Scope of Work Belle Terre Road (Pleasant Valley Way to Coolidge Avenue) & Roosevelt Avenue (Belle Terre Road to Lincoln Avenue) Belle Terre Road is a penetration macadam road that was resurfaced once by the Township about ten plus years ago because no State aid was available. It is now deteriorated and needs to be reconstructed with a new full depth pavement. There is no storm water collection system on this road and only some curbs. This street is in need of a storm sewer system and a new full depth pavement. New inlets will be constructed with Bicycle Safe Grates. New curbs are needed on this road to control the surface runoff. This section of Roosevelt Avenue is also a penetration macadam road and needs new curbs and new full depth pavement. It is one part of Roosevelt Avenue that was not improved with the other sections. No new storm sewer system is needed on this section of this road. Approximately 3,160 L.F. of Granite Block Curb; 5,266 S.Y. of Dense Graded Aggregate, 4" Thick; 695 Tons of Superpave HMA Surface Course, 2" Thick; and 1,390 Tons of HMA Base Course, 4" Thick will be constructed on this project. Driveways will be reconstructed where needed.
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation Scope of Work cont’d Location Map – 8.5 x 11 only – showing project limits 95567-BelleTerreRoadandRooseveltAvenueImprovementProj Note: All information must be clear and legible with street names labeled. You may include photos with your application by uploading them here: Does this project include a traffic signal? Yes ✔ No If Yes, please attach authorization to design or install if available. Will the project meet AASHTO standards? ✔ Yes No If No, list Design Exceptions below
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation ROADWAY DATA SHEET Project Classification Resurfacing ✔ Reconstruction Surface Treatment Drainage Widening New Roadway Existing Road Conditions. Please enter minimum Widths. If not known enter Zero. Note: If your application includes various locations use a weighted average value according to distance. Current ADT: 544 Truck Traffic over 5 Tons (%): 1 Legal Speed Limit (mph): 25 Right of Way Width (feet): 50 Is this Project located on a Commuter Bus Route? Yes ✔ No Pavement Width (feet): 30 Shoulder Width (feet): 0 Curbing: ✔ One Side Both Sides Neither Sidewalk: One Side Both Sides ✔ Neither Existing Minimum Width (feet): Parking Restrictions: No parking overnight, 2am to 5am Proposed Improvements. Please enter minimum Widths. If not known enter Zero. Right of Way Width (feet): 50 Pavement Width (feet): 30 Shoulder Width (feet): 0 Curbing: One Side ✔ Both Sides Neither Sidewalk: One Side Both Sides ✔ Neither Proposed minimum Width (feet): 30
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation Roadway Data Sheet cont’d Parking Restrictions: No parking overnight, 2am to 5am Is there an existing bridge being replaced or repaired? Yes ✔ No If Yes, please return to the Main Menu and begin a new application with Bridge Preservation selected on the Type of Improvement page. Explain how the project serves public fac ilities N/A
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation Roadway Data Sheet cont’d Explain how the project will improve safety It provides new traffic markings for the motorists.
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation TOTAL ESTIMATED COST OF IMPROVEMENT Construction Cost: $451,061.00 Please attach a Detailed Construction Cost Estimate 95569-BelleTerreRoadandRooseveltAvenu (Word, Excel, or PDF format please) Design Engineering: (List only if eligible for Urban Aid or as a Depressed Rural Center) Right-Of-Way: (List only if eligible for Urban Aid or as a Depressed Rural Center) Construction Inspection and Material Testing if requesting: $15,000.00 (15% of the final allowable construction cost maximum) Total Estimated Cost: $466,061.00 Total Requested Amount: $466,061.00 If you have submitted or plan to submit other applications, 1 Please prioritize your applications by assigning them a priority rating. Use number 1 for the highest priority. If you only plan to submit this application, please enter 1 as the priority rating:
Grant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation Applicant Information Name of Grantee West Orange Town Township Organization Address West Orange Town Township Municipal Building 66 Main Street West Orange, NJ 07052 Phone: (973) 325-4100 Email Address Federal Tax ID Number 22-6002396 Vendor Number 226002396 Vendor Unit west orange engineering Vendor Unit Address 25 lakeside avenue, west orange, nj 07052 Application Initiation Date 07/19/2010 Mayor Information First Name Robert Last Name Parisi County Essex Municipality Township of West Orange Address 1 66 Main Street Address 2 City West Orange State NJ Zip 07052 Phone 973-325-4100 E-Mail rparisi@westorange.org
File revisions (1)
- Sep 29, 2026
d4bfb9a199fc2,260,797 bytes