Supporting Documentation · Feb 1, 2023

PB 22 08 Dated 2022 11 08 West Orange Submission Letter

Preserved file SHA-2563e562b17764c3c1c37ecc7e55ebad8f08e95a88ca9f4118cfc142d7a9b1b7bba

Indexed text

Page 1

CHIESA SHAHINIAN & GIANTOMASI PC One Boland Drive, West Orange, NJ 07052 csglaw.com LISA A, JOHN-BASTA Member \john-basta@csglaw.com © 973.530.2083 F_ 973.530.2283 August 11, 2022 VIA HAND DELIVERY Diana Chandler-Zimmermann, Planning Board Secretary Township of West Orange Municipal Building 66 Main Street West Orange, NJ 07052 Re: William Cummings Application for Preliminary and Final Major Subdivision Approval 2 and 10 Ridge Road - Block 80.03, Lots 21 and 10 Dear Ms. Chandler-Zimmermann: This office represents William Cummings (the “Applicant”) in connection with his enclosed application for preliminary and final major subdivision approval as well as variance relief to create four (4) residential development lots from the above-referenced properties. On behalf of the Applicant, kindly accept six (6) sets of the following documents for filing with the Township of West Orange Planning Board (the “Planning Board” or the “Board”): Fully Executed Development Application and Attachment; Completed Check List Form; Preliminary List of Variances & Waivers, prepared by Dynamic Engineering, dated August 2022; Preliminary List of Required Regulatory Approvals, prepared by Dynamic Engineering, dated August 2022; Planning Report, prepared by Dynamic Engineering, dated August 8, 2022; Traffic Impact and Parking Assessment, prepared by Dynamic Traffic, dated August 5, 2022; Environmental Impact Statement, prepared by Dynamic Engineering, dated August 2022; NEW JERSEY NEW YORK 4886-5359-2622.v1

Page 2

August 11, 2022 Page 2 ¢ Report of Preliminary Geotechnical and Stormwater Basin Area Investigation, prepared by Dynamic Earth, dated June 8, 2022; ¢ Stormwater Management, Groundwater Recharge and Water Quality Analysis, prepared by Dynamic Engineering, dated August 2022; e¢ ALTA/NSPS Land Title Survey, prepared by Dynamic Survey, consisting of 1 sheet, dated May 11, 2022; and ¢ Preliminary and Final Subdivision, prepared by Dynamic Engineering, dated July 27, 2022, consisting of 12 sheets. Additionally, enclosed please find one (1) of the following: ¢ Check in the amount of $1,750.00 made payable to the Township of West Orange representing the application fee; e Check in the amount of $3,000 made payable to the Township of West Orange representing the escrow fee; and e Executed W9 form. Should you require any additional information or documentation in the review and processing of this application, please do not hesitate to contact me. LAJ:bs Enlcs. C: William Cummings (w/o encls) 4886-5359-2622.v1

File revisions (1)