Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 1, 2023

PB 22 08 Dated 2022 11 08 West Orange Submission Letter

Preserved file SHA-2563e562b17764c3c1c37ecc7e55ebad8f08e95a88ca9f4118cfc142d7a9b1b7bba

Indexed text · page 2

Show all pages
Page 2

August 11, 2022 Page 2 ¢ Report of Preliminary Geotechnical and Stormwater Basin Area Investigation, prepared by Dynamic Earth, dated June 8, 2022; ¢ Stormwater Management, Groundwater Recharge and Water Quality Analysis, prepared by Dynamic Engineering, dated August 2022; e¢ ALTA/NSPS Land Title Survey, prepared by Dynamic Survey, consisting of 1 sheet, dated May 11, 2022; and ¢ Preliminary and Final Subdivision, prepared by Dynamic Engineering, dated July 27, 2022, consisting of 12 sheets. Additionally, enclosed please find one (1) of the following: ¢ Check in the amount of $1,750.00 made payable to the Township of West Orange representing the application fee; e Check in the amount of $3,000 made payable to the Township of West Orange representing the escrow fee; and e Executed W9 form. Should you require any additional information or documentation in the review and processing of this application, please do not hesitate to contact me. LAJ:bs Enlcs. C: William Cummings (w/o encls) 4886-5359-2622.v1

File revisions (1)