ANTHONY MARUCCI PROFESSIONAL ENGINEER & LAND SURVEYOR, N.J. LIC. No. 25573 PROFESSIONAL PLANNER, N.J. LIC. No. 2124 PRELIMINARY & FINAL SITE PLAN GRADING, DRAINAGE, & UTILITY PLAN 87-89 ASHLAND AVENUE TOWNSHIP OF WEST ORANGE ESSEX COUNTY NEW JERSEY ‹&23<5,*+77KLVGUDZLQJLVWKHSURSHUW\RI0DUXFFL(QJLQHHULQJ$VVRFLDWHV//&,WLVVXEMHFWWRFRS\ULJKWODZVDQGVKDOOQRWEHXVHGRUFRSLHGZLWKRXWH[SUHVVZULWWHQSHUPLVVLRQ CAUTION: If this document does not contain a raised embossed seal of the professional under-signed, it is not an authorized original document. GENERAL NOTES: 1. INLETS SHALL BE CONSTRUCTED OF 6 INCH-THICK NJDOT CLASS B PRECAST CONCRETE. INLET FOUNDATIONS AND INVERTS SHALL BE CLASS B CONCRETE. 2. EXCEPT FOR INLETS TYPE A AND C, FOUNDATIONS AND INVERTS SHALL BE CONSTRUCTED IN TWO STAGES, AND THE BOTTOM OF THE FOOTINGS SHALL BE 8 INCHES BELOW THE OUTER WALL OF THE LOWEST PIPE IN THE INLET. 3. INLET FOUNDATIONS WHICH ARE PRECAST SHALL BE PLACED ON A 6 INCH-THICK BED OF COMPACTED COARSE AGGREGATE #57. THE COARSE AGGREGATE SHALL EXTEND 6 INCHES BEYOND THE HORIZONTAL LIMITS OF THE INLET FOUNDATION. 4. CASTINGS FOR PRECAST INLETS SHALL BE ADJUSTED TO GRADE WITH COURSES OF BRICK, AS REQUIRED, 12 INCHES MAXIMUM. FRAMES SHALL BE EMBEDDED IN NON-SHRINK GROUT. 5. WHEN THE DEPTH OF A PRECAST INLET EXCEEDS 10 FEET AS MEASURED FROM TOP OF GRATE TO INVERT, THE FOUNDATION SHALL BE INCREASED TO 12 INCHES THICK. WHEN ROCK IS ENCOUNTERED, THE DEPTH OF THE FOUNDATION SHALL NOT BE INCREASED. 6. MINIMUM WALL REINFORCEMENT FOR PRECAST INLETS TYPES A, B, C, E, D-1, AND B MODIFIED: DEPTH BELOW TOP OF GRATE HORIZONTAL REINF. VERTICAL REINF. WALL THK. 0' TO 10'-0" #4 @ 10" C.C. #4 @ 18" C.C. 6" 10'-1" TO 15'-0" #4 @ 8" C.C. #4 @ 18" C.C. 6" 15'-1" TO 20'-0" #4 @ 6" C.C. #4 @ 18" C.C. 6" NOTE: REINFORCING SHOWN FOR PRECAST INLETS IS THE MINIMUM REQUIRED. ADDITIONAL REINFORCING FOR HANDLING IS THE RESPONSIBILITY OF THE CONTRACTOR. SHOP DRAWINGS SHALL BE SUBMITTED FOR EACH STRUCTURE TO VERIFY REINFORCEMENT/DESIGN MEETS STANDARD REQUIREMENTS. ALTERNATE REINFORCEMENT DEPTH BELOW TOP OF GRATE 0' TO 10'-0" WWF 3 x 6 W6 WIRES SPACED @ 3 INCHES TO RUN HORIZONTAL IN ALL CASES . 10'-1" TO 15'-0" WWF 3 x 6 W6 ADD #10 REINFORCEMENT STEEL @ 18 INCHES HORIZONTAL. 15'-1" TO 20'-0" WWF 3 x 9 W6 ADD #10 REINFORCEMENT STEEL @ 9 INCHES HORIZONTAL OR ADD #4 REINFORCEMENT STEEL @

Page 4

ASES . 10'-1" TO 15'-0" WWF 3 x 6 W6 ADD #10 REINFORCEMENT STEEL @ 18 INCHES HORIZONTAL. 15'-1" TO 20'-0" WWF 3 x 9 W6 ADD #10 REINFORCEMENT STEEL @ 9 INCHES HORIZONTAL OR ADD #4 REINFORCEMENT STEEL @ 15 INCHES HORIZONTAL. 7. ALL INLETS AND MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND ITS AMENDMENTS. 8. CASTING SHALL BE CAMPBELL FOUNDRY No. 3425 BICYCLE-SAFE ECO GRATE OR APPROVED EQUAL. 9. PROVIDE POLYPROPYLENE LADDER RUNGS @ 12 INCHES O.C. FACING TRAFFIC. 10. PRECAST INLET RISER JOINTS SHALL BE GROUTED WITH MORTAR BY CONTRACTOR. 11. STRUCTURE SHALL BE CONSTRUCTED TO MEET HS-20 LOADING. INFILTRATION/DRYWELL CALCULATION SUMMARY: x NET IMPERVIOUS COVERAGE INCREASE: 1,646.2 SF (SEE LOT COVERAGE BREAKDOWN TABLE) x DETENTION STORAGE REQUIRED: 3.0" RAINFALL OVER NET INCREASE 3.0" (0.25') x 1,646.2 SF = 411.6 = 412 CF x DETENTION STORAGE PROVIDED: 746 CF (SEE STORAGE VOLUME CALCULATIONS) x 746 CF (STORAGE PROVIDED) > 412 CF (STORAGE REQUIRED) INFILTRATION/DRYWELL STORAGE VOLUME CALCULATIONS: SECTION AREA 18" PIPE: š  A 1.77 SQ.FT. SECTION AREA STONE: 4'x4' = 16.0 SQ.FT. 16.0 SQ.FT. - 1.77 SQ.FT. = 14.23 SQ.FT. 14.23 x 0.40 (VOID RATIO) = 5.69 SQ.FT. SECTION TOTAL: 1.77 SQ.FT. + 5.69 SQ.FT. = 7.46 SQ. FT. VOLUME TOTAL: 7.46 SQ.FT. x 100 FT (PIPE LENGTH) = 746.0 = 746 CF (PROVIDED) GRADING, DRAINAGE, & UTILITY PLAN NOTES: 1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWNSHIP OF HANOVER STANDARDS OR THE APPLICABLE REGULATORY AGENCY. 2. UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE, THEIR ACCURACY OR COMPLETENESS ARE NOT GUARANTEED BY THE ENGINEER. MARKOUTS FROM UTILITY COMPANIES AND FIELD CONFIRMATION BY CONTRACTOR MUST BE MADE PRIOR TO CONSTRUCTION SO THAT DISTURBANCE OR DISRUPTION TO THESE UTILITIES MAY BE AVOIDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE 1-800-ONE-CALL PRIOR TO ANY EXCAVATION. 3. THE CONTRACTOR SHALL CONFIRM THE LOCATION AND DEPTH OF THE EXISTING UTILITY TO WHICH THE CONNECTION IS BEING MADE BEFORE LAYING PIPE, CONDUIT, AND ORDERING PRECAST STRUCTURES, ETC. AS NECESSARY. ANY DISCREPANCY SHALL BE REPORTED TO THE DESIGN ENGINEER. IN CASES WHERE THE CONSTRUCTION OF ITEMS MEET EXISTING STRUCTURES, SUCH AS CURB, PAVEMENT, SIDEWALK, UTILITIES, ETC. THE CONTRACTOR OR SURVEYOR STAKING SUCH ITEMS SHALL VERIFY THE ELEVATION & LOCATION

Page 4

IN CASES WHERE THE CONSTRUCTION OF ITEMS MEET EXISTING STRUCTURES, SUCH AS CURB, PAVEMENT, SIDEWALK, UTILITIES, ETC. THE CONTRACTOR OR SURVEYOR STAKING SUCH ITEMS SHALL VERIFY THE ELEVATION & LOCATION OF THE EXISTING FEATURE PRIOR TO CONSTRUCTION. ANY AND ALL DISCREPANCIES OR QUESTIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 4. EXCAVATED SOIL NOT USED FOR RE-GRADING AS SHOWN ON THE PLANS SHALL BE REMOVED AND DISPOSED OF OFF-SITE. 5. ALL AREAS WHERE SOIL IS BEING SPREAD ACROSS THE YARD SHALL BE TOP-SOILED (4-INCH MINIMUM) AND SEEDED IMMEDIATELY FOLLOWING GRADING OPERATIONS. 6. THERE WILL BE NO DEVIATION FROM THE PROPOSED GRADING PLAN WITHOUT APPROVAL, IN WRITING, FROM THE TOWNSHIP ENGINEER. 7. AT THE DISCRETION OF THE TOWNSHIP ENGINEER, THE APPLICANT MAY BE REQUIRED TO FIELD STAKE A PROPERTY LIMIT IN THE INTEREST OF LIMITING THE DISTURBANCE TO THE SUBJECT PROPERTY. 8. MARUCCI ENGINEERING ASSOCIATES, LLC CERTIFIES THAT THE GRADING CAN TIE INTO THE EXISTING TOPOGRAPHIC CONTOURS AND ADJOINING LOTS WITHOUT ADVERSE GRADING IMPACT OR DRAINAGE IMPACTS AND THAT ALL DISTURBANCE AND GRADING CAN BE LIMITED TO WITHIN THE PROPERTY IN QUESTION. 9. THE APPLICANT SHALL, UPON NOTIFICATION FROM THE TOWNSHIP ENGINEER, FIELD STAKE WETLANDS AND/OR BUFFER AREA LIMITS PRIOR TO ANY LAND DISTURBANCE OR CLEARING (IF APPLICABLE). 10. A FINAL AS-BUILT SURVEY DEPICTING THE AS-BUILT CONDITIONS OF THE IMPROVEMENTS PROPOSED AS PART OF THIS APPLICATION SHALL BE REQUIRED PRIOR TO THE ISSUANCE OF OCCUPANCY PERMITS. UPON COMPLETING ALL WORK AND SUBMITTING AN AS-BUILT SURVEY, OUR OFFICE WILL PERFORM A FINAL SITE INSPECTION TO ENSURE IMPROVEMENTS WERE CONSTRUCTED IN ACCORDANCE WITH THE APPROVED APPLICATION AND SUBMITTED AS-BUILT SURVEY. IT IS THE RESPONSIBILITY OF THE OWNER/APPLICANT TO COORDINATE THE INSPECTIONS AS PART OF CONSTRUCTION, FINAL SITE INSPECTIONS, AND AS-BUILT SURVEYS, ETC. 11. THE PROPERTY OWNER IS AWARE THAT IF STORMWATER RUNOFF DRAINAGE PROBLEMS OCCUR ON THEIR PROPERTY AND/OR NEIGHBORING PROPERTIES AS A RESULT OF THE PROPOSED IMPROVEMENTS IT IS THE PROPERTY OWNER'S RESPONSIBILITY TO REMEDY THE DRAINAGE ISSUE. 12. THE CONTRACTOR SHALL HAVE ALL UTILITY TRENCHES CLOSED AT THE END OF EACH WORK DAY. IN NO INSTANCES SHALL ANY EXCAVATIONS BE LEFT OPEN. ROADWAY AREAS SHALL ALL BE RESTORED IN ACCORDANCE WITH TOWNSHIP/COUNTY STANDARDS. 13. THE SITE IS SUBJECT TO ANY AND ALL

Page 4

T THE END OF EACH WORK DAY. IN NO INSTANCES SHALL ANY EXCAVATIONS BE LEFT OPEN. ROADWAY AREAS SHALL ALL BE RESTORED IN ACCORDANCE WITH TOWNSHIP/COUNTY STANDARDS. 13. THE SITE IS SUBJECT TO ANY AND ALL OTHER AGENCIES HAVING JURISDICTION. 14. THE PROPOSED DRY WELLS ARE SUBJECT TO TEST PITS AND SOIL SAMPLING AS NEEDED. THE CONTRACTOR AND OWNER ARE REQUIRED TO CONSULT WITH AN ENGINEER AND SOILS LABORATORY TO OBTAIN SOIL LOG AND PERMEABILITY DATA FOR THE DRY WELL SYSTEM PRIOR TO INSTALLATION. THE CONTRACTOR AND OWNER SHALL CONTACT MARUCCI ENGINEERING ASSOCIATES, LLC AND/OR THE TOWNSHIP'S ENGINEERING DEPARTMENT WITH THE SOILS RESULTS TO CONFIRM THE DRAINAGE DESIGN AS SHOWN HEREIN. ADJUSTMENTS TO THE DRY WELL DESIGN OR ALTERNATIVE CONNECTIONS TO AVAILABLE TOWNSHIP STORMWATER SYSTEMS MAY BE REQUIRED AS A RESULT OF THE SOIL CONDITIONS. SOIL TEST PIT RESULTS SIGNED & SEALED BY A NEW JERSEY LICENSED PROFESSIONAL ENGINEER MAY BE REQUIRED AND SUBMITTED TO THE TOWNSHIP ENGINEER PRIOR TO COMMENCING CONSTRUCTION OF THE DRY WELL. THE SOIL TESTS SHALL DETERMINE THE DEPTH TO GROUNDWATER AND INCLUDE A CALCULATION TO ILLUSTRATE THE PROPOSED DRY WELL WILL DRAIN WITHIN 72 HOURS. IT IS THE RESPONSIBILITY OF THE OWNER/ CONTRACTOR TO CONTACT THE UNDERSIGNED IMMEDIATELY FOR ANY CONCERNS RELATED TO SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION. GRADING, DRAINAGE, & UTILITY NOTES : 1. THE PROPOSED IMPROVEMENTS PROVIDE 6)“ OF IMPERVIOUS SURFACES; THEREFORE THE PROPOSED APPLICATION IS NOT CONSIDERED A MAJOR DEVELOPMENT AS DEFINED BY THE N.J.A.C 7:8 STORMWATER MANAGEMENT REGULATIONS SINCE IT IS LESS THAN 1 ACRE OF DISTURBANCE AND 1/4 ACRE OF NEW IMPERVIOUS. 2. ALTHOUGH THE PROJECT IS NOT CONSIDERED A MAJOR DEVELOPMENT, THE APPLICATION IS PROVIDING DRYWELLS TO ATTENUATE & INFILTRATE A SMALL PORTION OF STORMWATER FLOWS FROM THE REAR/SIDE PARKING LOT AREAS TO BETTER FLOWS FROM THE SITE TO ADJACENT NEIGHBORING PROPERTIES. 3. THERE ARE NO PROPOSED BUILDING SERVICES PROPOSED WITH THIS APPLICATION. THE EXISTING BUILDING UTILITY SERVICES WILL BE RE-USED FROM THE EXISTING BUILDING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT AND MAINTAIN ALL EXISTING BUILDING SERVICE LATERALS. ANY UPGRADES OR REPLACEMENT OF SERVICES WILL NEED TO BE COORDINATED WITH THE UTILITY PROVIDERS AS NECESSARY. MARUCCI ENGINEERING ASSOCIATES, LLC ENGINEERS-SURVEYORS-PLANNERS POST OFFICE BOX 509 CEDAR KNOLLS,

Page 4

RADES OR REPLACEMENT OF SERVICES WILL NEED TO BE COORDINATED WITH THE UTILITY PROVIDERS AS NECESSARY. MARUCCI ENGINEERING ASSOCIATES, LLC ENGINEERS-SURVEYORS-PLANNERS POST OFFICE BOX 509 CEDAR KNOLLS, NEW JERSEY 07927 TEL./FAX: (973) 887-3066 NEW JERSEY STATE BOARD OF PROFESSIONAL ENGINEERS & LAND SURVEYORS CERTIFICATE OF AUTHORIZATION: No. 24GA28082400