Supporting Documentation · Oct 10, 2024
Crestmont ZBA Application Package 72224
57a4426f2e8f13a3dfae8da9a77807f42bdc406e5874ec32401e6e160f69aa04Indexed text · page 40
Show all pages2. The proposal is to build three (3) new pickleball courts. ua As to site plan requested waivers, items #20. 28, 34, 39, 44, 45 and 46 the Applicant provided information that there are no deed restrictions, no proposed lighting, no environmentally sensitive areas within at least 500 feet of the work area and due to the large size of the property, grade elevations and of all buildings and property corners are not provided but all relevant topographical data was shown on the plan and adjacent to the work area. 4. A waiver from submitting the Sustainability Checklist and for the requirement that Applicant submit a signed and sealed copy of the survey of the property these items are not relevant due to the very limited seope of the work and are not relevant to the oposed project. NOW THEREFORE be it resolved by the Planning Board of the Township of West Orange minor site plan approval is granted. AND IT IS FURTHER RESOLVED thar the above approval is subject to the following terms and conditions: 1. The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations and directives, iicluding without limitation, obtaining all applicable local, state and federal approvals and/or permits. Without limitation of the foregoing, prior to the signing of the approved site plans, and prior to the commencement of any land disturbance or construction but excluding interior renovations, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental approvals.
File revisions (1)
- Sep 29, 2026
57a4426f2e8f2,036,992 bytes