Supporting Documentation · Oct 10, 2024
Major Site Plan Checklist
fb5be43a63ba12599a9b0c42d7078c793562f2b43849f52bf24cd3ee12d2afe6Indexed text
Site Plan/Subdivision Checklist TOWNSHIP OF WEST ORANGE APPLICANT: ‘ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERS LICENSED PROFESSIONAL. Pre-Application - Concept Plan Major Application Minor Application General Subdivision Site Plan Item Number Description Development Subdivision | Site Plan Plan Preliminary Final Preliminary Final aLaTdNOO ALA TANOONI aaisanoay WAAIVAL 1 PROJECT-PLAT INFORMATION, 1, Hem: Name, address of owner and applicant 2, Item: Name, signature, license number, seal and address of engineer, land surveyor, architect, professional planner, and/or landseape architect, as applicable, involved in preparation of plat 3. Item Title block denoting type of application, tax ‘map sheot, county, name of rmunicipality, block & lot, and street location 4, Item: A key map at specified scale showing location ‘of tract with reference to surrounding properties, streets ‘municipal boundaries, et., within 500! ‘Comment: Describes setting; may be less detailed in pre-application-concept plan and GDP stages 5, tem A schedule of required and provided zone Aisrit(s) requirements including lot area, width, depth, vyard setbacks, building coverage, open space, parking, ‘Comment: Schedule may be less detailed in pre= application-concept plan stages 6, Item: North arrow and scale, 7. Item: Proof that taxes are current 8. Item Signature blocks for Chairman, S Municipal Engineer 9, Item: Appropriate certification blocks as required by Map Filing Law. 10, tem: Monumentation as specified by Map Filing Law ‘Comment: Monumentation required only for final subdivision, 11, Item: Date of eurtent property survey mmment: Required by Map Filing Law for final subdivision and site plan; necessary for vesting on GDP.
‘ALL DOCUMENTS MUST BE PREPARED, Major Application SIGNED AND SEALED BY NEW JERSEY . | 2 LICENSED PROFESSIONAL. g S|. a Z| 2s Pre-Application ; _— rs =| ge Concept Plan Minor Application General Subdivision Site Plan 3 |e ee Development . Item Number Description Plan Subdivision | Site Plan Pretiminay | Final] Pstiminasy | Final 12 ligm: One (1) of for () standardized sheets Sor A224 36h 1S x21 8 Se Cammen’ Required by Map Fling Law for ior and major subavisions x x x x x 15. ltem Mets and bounds description showing dimensions bearings, curve data length o angen rai re, chords aed centre angls foal centrines and right-of-way, and centrine eres x nsbeets x x x 14 lem: Affidavit of ownership Camment Map Filing Law for mine and major x subdivision x x x x 15. Item: Acreage of tract to the nearest tenth of an x acre for GDP to nearest are), x x x x x x x 16. sm Date of origina and al revisions Comment: Item necessary for continuity-history x of project. x x x x x x x proposed structures with all setbacks dimensioned. x ‘Comment tem important fo detailed panning x x x x x x x 18 em: Location and dimensions oF any existing or proposed sees (or GDP and preapplicatone concept plan — general locations) x Comment tem important for detailed planing x x x x x x x x 19am Al proposed lt ines and area of os in square fest x x x x x x 26. Hem Copy andor deinestion of ny existing o proposed deed restrictions or covenants..¢ x x x x x x x 21. Item: Any existing or proposed easement or land x reserved fore dedicated to public use. © x x x x x x x x 22. tsm, Development stages or staging plans (or GoP=seneral stax) Comment: Not applicable at preappliction- n/al concept plan stage, minor plans usualy ot bu in sagen x x x x
"ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY Major Application 6 zl. LICENSED PROFESSIONAL 8 8 | sz Ed =| g2 Pre-Application = = 3 48 Concept Plan Minor Application General Subdivision Site Plan g g 5 Development a Item Number Description Subdivision | Site Plan Plan Preliminary | Final | Preliminary | Final 23, Mem List of required regulatory approvals or permits x Comment: Basie planning information. x x x x x 24, Hem: Lis of variances required or requested. ¢ x Comment Basie planning information x x x x x x 25, Mom: Requested or obtained design waivers or exceptions. ‘Comment: Describes location ofall adjacent x structures, nol necessary at pre-application-concept plan stages; required at site plan stages; required at site plan only if notice is required by ordinance. x x x x 26, em: Payment of application fees. Comment: Fee not imposed for pre-application xX conference x x x x x x x x 27. Mem: Property owners and lines of all parcels ‘within 200" identified on most recent tax map sheet. ‘Comment: Describes location ofall adjacent structures; not necessary at pre-application-concept x plan stages; required at site plan only if nace is required by ordinance x x x x x 28, Mem’ All existing street, water courses, flood plains, wetlands or other environmentally sensitive areas on and within 200’ of site ‘Comment: while detailed specification of environmentally sensitive areas may not be w necessary at pre-application-concept plan and GDP stages, general specification of and sensitivity to such conditions isan important planning consideration x x x x x x x 29, em’ Existing right-of-way and/or easements on and within 200" of tract. Comment: Rights-of-way and easements are often unknown at the pre-application-concept (see w however, item 28) x x x x x x 30. tem: Topographical features of subject property from US.GS. map. x ‘Comment: More detailed topographic information is needed for major subdivision x w
‘ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL. Pre-Application - Concept Plan Major Application Minor Application General Subdivision Site Plan Item Number Description Subdivision Site Plan Development Plan Preliminary | Final Preliminary Final ALF TdWOo ALATAINOONI aaisanday WAAIVAN 31, Item’ Existing and proposed contour intervals based on UGS. & GS. datum, Contours to extend at Teast 200’ beyond subject property as follows: 3% + grade ~2' Comment: Major site plan and subdivision requires level of detail of Item 31 as opposed to Ttem 30. 32, Im: Boundary limits, nature and extent of wooded areas, specimen trees, and other significant physical features (detail may vary) ‘Comment: Basic for good planning 33. tom’ Existing system of drainage of subject site and of any larger tract or basin of which itis a part Comment: See Item 31. Extensive level of detail requited only for major subdivision and site plan. 34, tom: Drainage Area Map. Comment: Necessary for major application; inapplicable at GDP stage. 35, tem: Drainage Calculations Comment: Required for minor applications if deemed necessary by Planning Board; not required at GDP stage because storm water management evaluated at major subdivision and site plan stage. 36, Item: Proposed utility infrastructure plans, including sanitary sewer, water, storm water management, telephone, electric & cable TV. Comment: Information necessary for minor site plan because of potential effect on utility systems Only general location for electric, telephone and cable TV required. 37. tem’ Proposed utility infrastructure plans, including sanitary sewer, water, storm water management, telephone, electric and cable TV. Comment: Information necessary for minor site plan because of potential effect on utility systems Only general location for telephone, electric and cable TV required.
ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL. Pre-Application - Concept Plan Major Application Minor Application General Subdivision Site Plan Item Number Description Subdivision | Site Plan Development Plan Preliminary Final Preliminary Final aLaTANOO HLA TAWOONI aaisandaw {SALVA 38. Item’ Soil Erosion and Sediment Control Plan Comment’ Required for soil disturbance over 5,000 sq, fi. 39, Item’ Spot and finished elevations at all property comers, comers ofall structures or dwellings, existing of proposed first floor elevations, Comment: Not required for minor subdivision because not involving construction of buildings. 40, Item: Construction details as required by ordinance Comment’ Such level of detail necessary only for ‘major applications 41, Item: Road and paving cross-sections and profiles Comment: See Item 40 n/a 42. Item: Proposed street names. Comment: Applicable only when new road is proposed n/a 43. Item: New block and lot numbers confirmed with local assessor or municipal designee. Comment: Needed whenever a new lat is created, n/a 44, Item: Lighting plan & details. Comment: Not applicable for minor subdivision because just creating lots. 45, tom: Landscape plan & details prepared by a professional landscape architect Comment: Required for site plans because of ‘magnitude of required landscaping. 46, Item: Solid waste management plan, Comment: Site plan consideration only; see Item 44 47. em’ Site identification signs, traffic control signs, and directional signs. ‘Comment: See Item 44
"ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL Major Application Pre-Application - Concept Plan Minor Application General Development Subdivision Site Plan sti Plan Item Number Description Subdivision | Site Plan Preliminary | Final Preliminary Final ALATNOD SLATANOONI aaisanoay WAAIVAL 48. tem: Sight triangles. Comment: Necessary even for minor applications because sight triangle easement created x 49. Item: Vehicular and pedestrian circulation patterns (less detail necessary for pre-application- concept plan and GSP stages). Comment: See lem 44 x x x 50, Item: Parking plan showing spaces, size and type, aisle width, curb cuts, drives, driveways, and all ingress and egress areas and dimensions. Comment: See Item 44 51, Kom: Preliminary architectural plan and elevations Comment: Not required where building is not, proposed x 52, tem: Plans and le wath West Orange CO! | dogments for compliance « Proposed restrictions or covenants do not have to be included for pre-application-concept plan and GDP. Conditional approval may be granted subject to other regulatory approvals. ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL. REVISED: 8/30/05 aw F Forms & Awards\PB-ZBAPP FRM\CHECKLST\CHECKLST FRM
File revisions (1)
- Sep 29, 2026
fb5be43a63ba1,804,567 bytes