Supporting Documentation · Oct 10, 2024
Major Site Plan Checklist
fb5be43a63ba12599a9b0c42d7078c793562f2b43849f52bf24cd3ee12d2afe6Indexed text · page 1
Show all pagesSite Plan/Subdivision Checklist TOWNSHIP OF WEST ORANGE APPLICANT: ‘ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERS LICENSED PROFESSIONAL. Pre-Application - Concept Plan Major Application Minor Application General Subdivision Site Plan Item Number Description Development Subdivision | Site Plan Plan Preliminary Final Preliminary Final aLaTdNOO ALA TANOONI aaisanoay WAAIVAL 1 PROJECT-PLAT INFORMATION, 1, Hem: Name, address of owner and applicant 2, Item: Name, signature, license number, seal and address of engineer, land surveyor, architect, professional planner, and/or landseape architect, as applicable, involved in preparation of plat 3. Item Title block denoting type of application, tax ‘map sheot, county, name of rmunicipality, block & lot, and street location 4, Item: A key map at specified scale showing location ‘of tract with reference to surrounding properties, streets ‘municipal boundaries, et., within 500! ‘Comment: Describes setting; may be less detailed in pre-application-concept plan and GDP stages 5, tem A schedule of required and provided zone Aisrit(s) requirements including lot area, width, depth, vyard setbacks, building coverage, open space, parking, ‘Comment: Schedule may be less detailed in pre= application-concept plan stages 6, Item: North arrow and scale, 7. Item: Proof that taxes are current 8. Item Signature blocks for Chairman, S Municipal Engineer 9, Item: Appropriate certification blocks as required by Map Filing Law. 10, tem: Monumentation as specified by Map Filing Law ‘Comment: Monumentation required only for final subdivision, 11, Item: Date of eurtent property survey mmment: Required by Map Filing Law for final subdivision and site plan; necessary for vesting on GDP.
File revisions (1)
- Sep 29, 2026
fb5be43a63ba1,804,567 bytes