Supporting Documentation · Oct 10, 2024
Major Site Plan Checklist
fb5be43a63ba12599a9b0c42d7078c793562f2b43849f52bf24cd3ee12d2afe6Indexed text · page 2
Show all pages‘ALL DOCUMENTS MUST BE PREPARED, Major Application SIGNED AND SEALED BY NEW JERSEY . | 2 LICENSED PROFESSIONAL. g S|. a Z| 2s Pre-Application ; _— rs =| ge Concept Plan Minor Application General Subdivision Site Plan 3 |e ee Development . Item Number Description Plan Subdivision | Site Plan Pretiminay | Final] Pstiminasy | Final 12 ligm: One (1) of for () standardized sheets Sor A224 36h 1S x21 8 Se Cammen’ Required by Map Fling Law for ior and major subavisions x x x x x 15. ltem Mets and bounds description showing dimensions bearings, curve data length o angen rai re, chords aed centre angls foal centrines and right-of-way, and centrine eres x nsbeets x x x 14 lem: Affidavit of ownership Camment Map Filing Law for mine and major x subdivision x x x x 15. Item: Acreage of tract to the nearest tenth of an x acre for GDP to nearest are), x x x x x x x 16. sm Date of origina and al revisions Comment: Item necessary for continuity-history x of project. x x x x x x x proposed structures with all setbacks dimensioned. x ‘Comment tem important fo detailed panning x x x x x x x 18 em: Location and dimensions oF any existing or proposed sees (or GDP and preapplicatone concept plan — general locations) x Comment tem important for detailed planing x x x x x x x x 19am Al proposed lt ines and area of os in square fest x x x x x x 26. Hem Copy andor deinestion of ny existing o proposed deed restrictions or covenants..¢ x x x x x x x 21. Item: Any existing or proposed easement or land x reserved fore dedicated to public use. © x x x x x x x x 22. tsm, Development stages or staging plans (or GoP=seneral stax) Comment: Not applicable at preappliction- n/al concept plan stage, minor plans usualy ot bu in sagen x x x x
File revisions (1)
- Sep 29, 2026
fb5be43a63ba1,804,567 bytes