Supporting Documentation · Nov 21, 2024
Full set 15 North Edgewood ave
b7947fa93d02ce9ad9b082c71a7be153ad60ee6c4d4d7e576569415093926f16Indexed text · page 1
Show all pagesADDITIONS AND RECONSTRUCTION TO RESIDENCE PROJECT FOR . OWNER: MS. CELESTE R. JENKINS 15 EDGEWOOD AVENUE NORTH WEST ORANGE, NJ 07052 PROJECT: 2024-01 | DATE: JULY 29, 2024 WILLIAM M. BROWN III, FAIA, NOMAC, LLC. ARCHITECT 23 NASSAU RD. VERONA, NJ 07044-2905 i LICENSE #: 21A101189200 (GENERAL NOTES ‘SYMBOLS INDEX OF DRAWINGS | SIGNATURES All dimensions shall be verified in the field. ‘The contractor shall be responsible for the methods and means of construction and site safety. All unsafe site conditions shall be corrected immediately by the contractor ant no additional expense to the Owner. The removal of lead paint, asbestos or other environmental hazards shall be at the expense of the Owner. 4. The Contractor shall obtain all permits which are to be paid by the Owner and schedule inspections as required for the project and pay all fees as required by the Township of West Orange, NJ Building Department. . The Contractor shall notify the Architect of any discrepancy or variation from the plans required for construction prior to ordering of materials and the construction work. 6. The Contractor shall provide for the legal removal and disposal of all waste for the duration of the project. Trash and debris shall not to be allowed to accumulate within the house or on the exterior but shall be removed from the site daily. 7. The contractor shall make provisions to rent a dumpster. 8. The project shall be following the 2021 IBC NJ Residential Code, the 2021 International Energy Conservation Code, the Rehabilitation Subcode, and the latest editions of the National Plumbing Code, International Mechanical and the National Electrical Code. 9. The Contractor shall be responsible for any shoring that is required. 10. All mechanical HVAC work shall be performed by others. all gypsum board work ready for painting with Type 5 finish. 11. All finishes and painting will be performed by others. Contractor shall tape and spackle 12. The Contractor shall coordinate with the Architect all wood blocking areas and the protection of all new bathroom fixtures during construction. All appliances and bathroom fixtures and accessories will be selected by the Owner and installed by others. 13. Any existing brick that is removed shall be stockpiled and reused where applicable -as per new construction. 14. The new proposed heat pump and concrete pad shall be
er and installed by others. 13. Any existing brick that is removed shall be stockpiled and reused where applicable -as per new construction. 14. The new proposed heat pump and concrete pad shall be installed by others. C ) ~ DOOR DESIGNATION CO TINTERIOR ELEVATION PD-I “NEW PARTITION SP-1 a) _- [~~] <exisTine To REMAIN a ——--—+ REMOVALS UNLESS “ b+ ——+ (NOTED OHERWISE | : ERWISE A-2 Ch “SECTION DESIGNATION A3 =wooD. A-4 SYD. —ecaurking . boos : “PLYWOOD TOMA] «= wsucation CONCRETE ZI FINISHED Wooo OAK 2 eva r ‘GYPSUM BOARD A PHOTOGRAPH DIRECTION DESIGNATION Cover Sheet Project Data Information, Maps, Charts and Diagrams Survey, Plot Plan, Notes and Details Existing Conditions and New Emergency Escape Window Photographs Lower Level and Family Room Plan First Floor and Upper-Level Plan Roof Plan ” Elevations “CHAIRMAN “SECRETARY. "MUNICIPAL ENGINEER
File revisions (1)
- Sep 29, 2026
b7947fa93d0232,730,187 bytes