Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 14, 2024

04_AECOM_Environmental Report_Final

Preserved file SHA-256294edc1f118d9afed4a8864a2ccbcd5a5f84aa0bf548820a10a2c5f2279b4083

Indexed text · page 34

Show all pages
Page 34

——s [Project Name Wonder Smokehouse Testing Project Number 60735150 Date EES Source Stack Moisture Determination Imp No. | Contents Vol{m) | Configuration | Initial We) Final weiter | Particulate Matter (incl.Condensable) | EPA Method 5/202 1 empty Short Stem 36 G4 en a 2 empty aka 60¢,0 | 3 Water 100 ALS” Wiese 4 Stlica Get ~300g 922.6 do Filter Filter 10 Number Zasec [OR Sample Log Sample 1D Number Sample Container T Description Wondstka 2 2. — -M5/202-FNR 250m! Probe and _ Nozale Rinse Wondstk1 — a 2 “15/202 Filt Petri Dish Filter WondStk1 _ b L -MS/202 Wifins 1000 mi Water Rin: wondstk1 — f2 Lb -MS/202-Orghins 250m ‘Orgamec Rinse Wond5tk1 a °M5/202-CPMFilt Petn Dish CPM Filter Condition No wri lock * XS ,s) Balance 10 AP ace [scores by oa Sample Recovery Checklist Rinse and brush probe and nozzle with acetone (three times) into PNR sample bottle. Disconnect transfer line Transfer any water in transfer line or condenser into the knockout impuger Rinse transfer line and condenser with water (two times] into water rinse sample bottle. Rinse with acetane (ane time} and hexane (twa times) into the argame rinse sample bottle. Transfer water from knockout impinger to second impinger. Ensure that water level is a least 1 cm abave stem tip. Add water if necessary. Volume of water added: if all water in knockout impinger will not fit in second ampinger, replace stem on knockout impinger. Ensure that the water level in the first impinger 1s at least 1 cm above stem tip. Add water if necessary Volume al water added: Purge with nitrogen for one hour at >14 ilers per minute Record start and end times on the data sheet Start Stop Separate filter holder and place filter in clean pre-rinsed glass petri dish. Complete Filt sample label Rinse front half of filter holder with acetone {three times) into PNR bottle. Complete probe and nozzle rinse (PNA) sample label rw Rinse the back haif of the filter holder and any connecting glassware with water (two times) into the water rinse sample bottle Rinse the back half of the filter haider and any connecting glassware with acetone {one time) and with hexane (two times) into the organic rinse sample bostle Separate CPM filter holder and place CPM filter in clean pre-sinsed glass petri dish. Complete CPM-Fitt sample label, Disassemble sample train, wipe

Page 34

(two times) into the organic rinse sample bostle Separate CPM filter holder and place CPM filter in clean pre-sinsed glass petri dish. Complete CPM-Fitt sample label, Disassemble sample train, wipe off excess water and weigh each smpinger. Record the final weights in the Marslure Determination section of this data sheet Nate canditian of the silica gel impinger. 4.0% spent Pour the contents of the first two impingers into the water rinse catch bottle(s} Rinse impingers, connecting glassware And the front hall of the CPM filter holder two times with water into the same boltles. Complete water rinse sample label. Rinse the first two smpingers, connecting glassware, and the front hall of the CPM filter holder acetane (one time} and hesane (two times] into the organic rinse samale bottle{s) Log samples into logbook and store appropriately. —— a Notes: RDS-47 - PM and Condensables by EPA Method 5/202) Per: EM SOP-047) Issued: July 2023 Document reviewed benmalty|

File revisions (1)