Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 14, 2024

04_AECOM_Environmental Report_Final

Preserved file SHA-256294edc1f118d9afed4a8864a2ccbcd5a5f84aa0bf548820a10a2c5f2279b4083

Indexed text · page 69

Show all pages
Page 69

Determination of Traverse Points Method 1 - Circular Duct Project Wonder Smokehouse Testing Project Nonber 60735150 Facility Wonder NJ Source Stack Operator, TL Mee? Date 8/5/24 ime (8) 1G Velocity Only Isokinetic Sampling Upstream from Disturbance (Exit) (A) Distance from Number of Ports to be sampled 4s Disturbance (ft/in) 30% Total number of Traverse Points (fram Figure 2 (velocity) or 1 (all isokinetic sampling)} Distance from Disturbance (diameters) \.6¢ Number of traverse points per port Duct Diamet Measurement 7 — 4 Plant Information Port Depth! © Diameter u (ftfin) {® Downstream from Disturbance (B) Measurement Distance from oS a Mea Information Disturbance (ft/in) i} 6 Distance from Disturbance {diameters} Gg TY {Measurement 6 Plant information Traverse Percent of Distance Marking Traverse Percent of | Distance from} Marking Point! Diameter from Wall? Location Point Diameter Wall Location {in} (in) tin) tin) 1 3, 2 56 x Yn" 13 2 Ye % 14 10.57 1% (Bs EY 14 a4 yj nN 3 % a 15 4 x 16 32.3 | Fw | See 5 62.7 2%” \4 gr 17 6 8 (Y 4X t4 4 Lon 18 of |B" |W 4 7 [aes | tee] ee . 8 46.8 (73 Ww 17% w 20 9 21 10 22 11 23 12 24 1 = Traverse point locations can be found using te figures on data sheet FOS-O3F, 2- According to Method 1, for stacks between 12 and 24”, no point may be within % inch of the wall. For stacks greater than 24”, no point may he within 1 inch of the walt. the ports, disturbances, a1 & FDS-03A Method 1 Circular Duct Per EM SOP-O1i Issued: December 2023 Document reviewed biennially

File revisions (1)