Supporting Documentation · Dec 4, 2024
ECCC_Pool House Resolutions submission
556364cf9d6c091a526c1b5bda0653f46bcb01ca77ef7a9635972b813bde1c5aIndexed text · page 25
Show all pagesManagement Report prepared by Matrix New World Engineering dated March 14, 2014. The Board received review letters from Paul Grygiel, AICP, PP, Acting Planning Director dated April 4, 2014 and from Eric Keller, PE, PP, LEED AP, Consulting Engineer dated April 3, 2014, April 29, 2014 and May 28, 2014. Applicant introduced into evidence the following exhibits during the hearing: Ex. A-1 — Colorized Aerial Photo of the Site Ex. A-2 - Colorized Site Rendering Ex. A-3 — Architectural Plans prepared by JGA Architectural Design last revised May 21, 2014 Ex. A-4 — Planning Report by Peter Steck, PP dated June 4, 2014 The application was introduced by Joseph Vena, Esq. who stated that Applicant seeks to amend the prior site plan approvals in order to upgrade and make additions to the clubhouse with minor modifications to the adjacent parking lot. He identified the Applicant as the oldest golf club in New Jersey with a long history of distinguished members including West Orange inventor Thomas Edison. Christopher Field was sworn and identified as the President of the Club. He stated that he has been a member for many years and is very familiar with the number and types of functions that are held in the clubhouse. He testified that there are currently 285 golf members and that at their largest event they have approximately 320 people at most. The Club currently has 206 parking spaces but with restriping for
File revisions (1)
- Sep 29, 2026
556364cf9d6c17,499,194 bytes