Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 22, 2025

THEWAYMAKER SITE PLAN APPLICATION 91824

Preserved file SHA-256de07971534c9eac31a13826633f4ef7e557ce0d4b6703a8d2a0941c4497a94ba

Indexed text · page 18

Show all pages
Page 18

. Lothian on-site parking and the potential for 2 future he thi ecessary, and the par both the office building erforming arts center. censed architect retained by the Applicant, described the He further testified to the exterior appearance for ribed the use of brie! the front and rear elev , stone and g beautiful facade which will ment the adjoining townhouse community. He respo h respect to the rear e ibed par the concerns of the Planning Director particularly ¥ i Avenue and Route 280. He desc: is somewhat skewed toward 4 ion of the site and some 26 location of stalls and the location of the building in the lowest po feet lower than the nearest townhouse. He further described that all roof mechanical e clions by architectural screen! He also testi 2 p 5 a 5 G 8 Z. 5 a z chitecture. that the wetlands places 1 Lake. Friedman. testified both as to osal concerning Cr the developm: and tc his study and management prof that the ed as set forth upon the site plan as a result ¢ He did. however. indicate that there would be green space and undisturbed and debr: as to clean the lake perimeter ‘rom 0,006.00 t to the Developer's tenance of Crystal Lake. ni pr nd eve . shrubs and the nearest lownhouse cluster.

File revisions (1)