Supporting Documentation · Jun 12, 2025
EX 1 PB 98 11 Highview at West Orange Resolution Adopted See Last Paragraph
db6c2d3243e11f7df8504ab7e5501eaaa7e0e9dec1f613e18e9ca8a5fdcab134Indexed text · page 11
Show all pages5. Approval from the Hudson, Essex and Passaic Soil Erosion District of a soil erosion and sediment control plan. 6. If another governmental agency grants a waiver of variance of a regulation affecting this approval or the conditions attached to it then this Board shall have the right to review that issue as it relates to this approval and these conditions and modify or amend the same. Specific Conditions The Applicant shall: a. Report back to the Planning Board 1 year after full occupancy of the office building to determine whether there shall be any necessity to construct a parking deck. b. Meet with and coordinate with the Planning Director concerning landscaping particularly in the vicinity of the rear elevation of the office building and around the performing arts center. c. The Applicant shall execute, prior to the issuance of a Certificate of Occupancy, an Affidavit of Compliance certifying they have fulfilled all conditions set forth which shall be to the satisfaction of the Township Planner, Engineering Department and Building Department of the Township of West Orange, who shall be furnished with a copy of this resolution. No Certificate of Occupancy shall be issued until receipt of an executed Affidavit of Compliance approved and signed by the Zoning Official. d. Comply with the requirements of the West Orange Fire Department but it shall not be required to leave Eagle Ridge Drive open. It will, however, continue to maintain and allow access to the water service currently located in or near Eagle Rock Drive. e. Solicit suggestions from the traffic consultant, Harold Maltz, concerning protection against thru traffic on Harrington Terrace. f. Comply with Exhibit A6 for the size and Style of the Project Identification Sign. g. Consult with the Township Engineer concerning the type and style of the proposed lighting within the townhouse community. h. Comply with the requirements of the Residential Site lene Standards. 10
File revisions (1)
- Sep 29, 2026
db6c2d3243e13,818,410 bytes