Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 12, 2025

Letter 10 18 of Explanation for 42 ERW

Preserved file SHA-2567c9a7ab38b7d1707e34739c22e65943aa0640ef0a0f7b3631244d1cab838c7ef

Indexed text · page 2

Show all pages
Page 2

Application: WAYSTONE REALTY LLC Block 106 Lot 24.01 42 Eagle Ridge Way Submitted: | October 18, 2024 Additionally, there is a pre-existing drainage ditch on the property that serves to transport stormwater from off-site sources on and abutting Eagle Ridge Way as well as the stormwater from the subject property adjacent to the ditch. The Owner maintains and keeps the ditch free of debris And finally, the walkways on site will have pervious pavers and entire driveway will be pervious material. This proposed construction together with the proposed landscaping will eliminate stormwater shedding in the front of the property. CONCLUSION This Application includes the collection of on-site stormwaiers to include substantially alt of the grassed and landscaped areas with a storm tech underground detention system. Substantial landscaping is included, and multiple grass paddocks with new shade trees are also proposed. The attached detailed description of the project and the purposes of the project set forth to provide for hippotherapy as an essential therapeutic form for the occupant, Jordan Cohn, satisfies the basis for the variances requested. The Owner trusts that with the engineering and construction contemplated for this Application, all efforts have been taken to be in full compliance with the directive of the township engineer to file a Major Development Application and comply with the West Orange Stormwater Management Ordinance. Respectfully submitted, PJT/alr cc: Waystone Realty LLC (via electronic mail)

File revisions (1)