Supporting Documentation · Jun 12, 2025
241220_42 ERW_Stormwater Report FULL
d03e96cdee7ab29cf176d8cadd465870ed56f0a0c25588573899530a82716544Indexed text · page 95
Show all pagesAnnual Groundwater Recharge Analysis (based on GSR-32) Project Name: Waymaker Select Township ↓ Average Annual P (in) Climatic Factor Description: Proposed Site Improvements ESSEX CO., WEST ORANGE TOWN 49.0 1.67 Analysis Date: 11/18/24 Land Segment Area (acres) TR-55 Land Cover Soil Annual Recharge (in) Annual Recharge (cu.ft) Land Segment Area (acres) TR-55 Land Cover Soil Annual Recharge (in) Annual Recharge (cu.ft) 1 0.319 Impervious areas Boonton 0.0 - 1 0.847 Impervious areas Boonton 0.0 - 2 2.773 Open space Boonton 14.9 150,467 2 2.245 Open space Boonton 14.9 121,817 3 Gravel, dirt Boonton - - 3 Gravel, dirt Boonton - - 4 Gravel, dirt Freehold - - 4 Open space Woodstown - - 5 Row Crop Woodstown - - 5 0 brush Adelphia - - 6 Impervious areas Woodstown - - 6 0 Brush Adelphia - - 7 Open space Woodstown - - 7 0 Brush Adelphia - - 8 0 brush Adelphia - - 8 0 Brush Adelphia Variant - - 9 0 brush Adelphia - - 9 0 Brush Adelphia - - 10 0 brush Adelphia - - 10 0 Brush Abbottstown - - 11 0 Brush Abbottstown - - 11 0 Brush Abbottstown - - 12 0 Brush Abbottstown - - 12 0 Brush Abbottstown - - 13 0 Brush Abbottstown - - 13 0 Brush Abbottstown - - 14 0 Brush Abbottstown - - 14 0 Brush Abbottstown - - 15 0 Brush Abbottstown - - 15 0 Brush Abbottstown - - Total = 3.1 Total Annual Recharge (in) Total Annual Recharge (cu-ft) Total = 3.1 Total Annual Recharge (in) Total Annual Recharge (cu.ft) 13.4 150,467 10.9 121,817 Procedure to fill the Pre-Development and Post-Development Conditions Tables % of Pre-Developed Annual Recharge to Preserve = 100% Total Impervious Area (sq.ft) 36,895 For each land segment, first enter the area, then select TR-55 Land Cover, then select Soil. Start from the top of the table Post-Development Annual Recharge Deficit= 28,650 (cubic feet) and proceed downward. Don't leave blank rows (with A=0) in between your segment entries. Rows with A=0 will not be displayed or used in calculations. For impervious areas outside of standard lots select "Impervious Areas" as the Land Cover. RWC= 3.59 (in) DRWC= 0.00 (in) Soil type for impervious areas are only required if an infiltration facility will be built within these areas. ERWC = 0.59 (in) EDRWC= 0.00 (in) Pre-Developed Conditions Post-Developed Conditions Recharge Efficiency Parameters Calculations (area averages) Annual Recharge Requirements Calculation ↓ New
e areas. ERWC = 0.59 (in) EDRWC= 0.00 (in) Pre-Developed Conditions Post-Developed Conditions Recharge Efficiency Parameters Calculations (area averages) Annual Recharge Requirements Calculation ↓ New Jersey Groundwater Recharge Spreadsheet Version 2.0 November 2003 This document was created by an application that isn’t licensed to use novaPDF. Purchase a license to generate PDF files without this notice.
File revisions (1)
- Sep 29, 2026
d03e96cdee7a5,190,307 bytes