Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 12, 2025

EX Pool 7 Zayibeth Stormwater Drainage and Grading Review Memo 3323

Preserved file SHA-256985cf264a6b44b5463afa2764fdbb0b9da378cd3bad571061738fee271c89559

Indexed text · page 1

Show all pages
Page 1

AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org TOWNSHIP OF WEST ORANGE DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 ZAYIBETH Y. CARBALLO Tel: (973) 325-4160 Assistant Municipal Engineer Fax: (973) 669-9588 Email: engineering@westorange.org MEMORANDUM TO: TOM BIONDI JR., CONSTRUCTION OFFICIAL FROM: ZAYIBETH CARBALLO, ASSIST. MUNICIPAL ENGINEER DATE: MARCH 3, 2023 SUBJECT: POOL LOCATION AND GRADING PLAN 40 EAGLE RIDGE WAY BLOCK 106, LOT 20.03 We are in receipt of the following information pertaining to the above-referenced application: A. Plan entitled, “Grading Plan, prepared for Lot 20.03, Block 106, #40 Eagle Ridge Way, Township of West Orange, Essex County, N.J.” The plan prepared Matarazzo Engineering, LLC (Frank Matarazzo, P.E., L.S.) is dated December 17, 2022 with a revised date of February 14, 2023; and B. Drainage Report entitled, “Drywell Design, 40 Eagle Ridge Way, Lot 20.03, Block 106, Township of West Orange, Essex County, New Jersey.” The report prepared by Matarazzo Engineering, LLC (Frank Matarazzo, P.E., L.S.) dated December 2022. We have reviewed the information provided and offer the following comments: 1. The project proposes to increase impervious coverage. Drainage report with calculations have been provided for the drywells to accommodate the increase in runoff; 2. Rip-rap should be added to the outflow pipe from control structure; 3. Applicant to provide soil erosion and sediment control plan and certification from Essex-Hudson-Passaic Soil Conservation District since the area of disturbance is greater than 5,000 SF.RESPONSE TO OPRA 2024-53_000071

File revisions (1)