Supporting Documentation · Feb 12, 2025
EX Pool 10 Township Project Inspection Activity Reports
b90673145bfe02d152e583d47eda68cc548f22ae5374e1adfcf7cd01d5ad385fIndexed text · page 2
Show all pagesOFFICE OF THE CONSTRUCTION OFFICIAL 66 Main Street Township of West Orange October 20,2022 40 EAGLE RIDGE WAY WEST ORANGE , NJ 07052 WAYMAKER LLC, 40 EAGLE RIDGE WAY Block 106 5NewCon West Orange, NJ 07052 20222143 973-3254112 Y Y Y Y N Y Project Inspection Activity Report Permit No.: Issued On: Closed On: IDENTIFICATION Work Site Location: Owner In Fee Address: Work Type and Description Subcodes: Bldg Elec Fire Plmb Elev Mech Number of Updates HISTORY Requested On Inspected On Subcode Inspector Inspection Types and Results Comment Lot 20 03 POOL HOUSE POOL PATIO/ HARDSCAPES TUNNEL TO MAIN HOME- building inspections need at least an hour Building FOOTING :02/26/2024 *** : : 08/23/2023 Building INSULATION : P08/23/2023 *** : : 08/02/2023 Building FRAME : P08/02/2023 *** SLAB : P REBAR : P 07/24/2023 Building FOOTING : P07/24/2023 *** : : 05/26/2023 Building BACKFILL : P05/26/2023 CEC : : 04/18/2023 Building RETAIN WALL : P04/18/2023 CEC : : 04/11/2023 Building FOOTING : P04/11/2023 CEC SLAB : P : 03/03/2023 Building FOOTING : F03/03/2023 CEC : : no permit in zoning 02/24/2023 Building ROOF SLAB : C02/28/2023 CEC : : CHESTER TOLD CONTRACTOR INPSECTIN WAS NOT NEEDED 02-24-23 02/09/2023 Building CONCRETE : P02/09/2023 CEC : : 02/01/2023 Building SLAB : P02/01/2023 CEC : : 1st floor 01/24/2023 Building SLAB : C01/26/2023 CEC : : 12/08/2022 Building FOUNDATION : P12/08/2022 CEC : : 11/30/2022 Building FOUNDATION : C11/30/2022 CEC : : 11/16/2022 Building FOOTING : P11/16/2022 CEC : : 01/16/2024 Electrical TRENCH : P01/16/2024 AB : : Page 1 of 340 EAGLE RIDGE WAYReport Run On : 03/27/2024 1:20PM RESPONSE TO OPRA 2024-55_000032RESPONSE TO OPRA 2024-1007_001092
File revisions (1)
- Sep 29, 2026
b90673145bfe1,364,700 bytes