Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 12, 2025

EX DD 22 20250112 Ltr to Andy Jane Kessler re Berm and Trees of Heaven

Preserved file SHA-2566faca65d5e449c551bb21a9f222ea11c440108cca831a7b7985f0e21a772d7e3

Indexed text · page 2

Show all pages
Page 2

Fig. 2. Installation of 10 (double height) seepage tanks. The stormwater system we installed was designed to manage runoO from our house and our new construction, accommodating even a 100-year storm. It was not intended to address runoO from Eagle Ridge Way or that originating upstream of us—from the Crystal Pointe Condominium—that flows down the drainage ditch between 40 and 42 ERW. The system installed is working as designed. This has been independently acknowledged by the HEP Soil Conservation District, whose inspections confirmed no runoO from our system contributed to the drainage ditch. Janet Rekesius, District Manager memorialized this in an email to Chief Abbot on April 10, 2024: Fig. 3. Email from HEPSCD produced in OPRA response. The increase of runoO from the drainage ditch could be due for many factors, but the installation of the pool and cabana was not one of them. Unfortunately, eOorts to collaborate with the Township and their representatives, particularly Mr. Trenk, have not been constructive. Instead of fostering cooperation, there has been a pattern of -2-

File revisions (1)