Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 12, 2025

EX Flow 2240719_JC_JF_Memo

Preserved file SHA-256ec3577dcdf103623d157924fc1fd8184e59b1c02a38ce7edf79684f28aa820a8

Indexed text · page 4

Show all pages
Page 4

Project No. 24006174A July 19, 2024 Page 4 | 9 Figure 3: Drone Image Taken After Heavy Rainfall In addition to the lack of stormwater control from the offsite sources, New Jersey has experienced and recorded unseasonably high rain and increased thunderstorm events. Therefore, we consider the outfall to be an issue that requires immediate attention. While we believe that imposing obligations on the association to comply with the Resolution remains within the Township’s authority and may be part of the Township’s long-range plans to improve the storm drainage conditions in Llewellyn Park, we nevertheless considered what the owner of 40 Eagle Ridge Way may do to help alleviate this situation. That is why we propose an Outlet Control Structure (OCS) to reduce the downstream flow in a manner that will work to both reduce the flow of stormwater from the pre-existing damaged dual 12” pipes and act as a collector to assure that only rainwater falls down the mountain slope and not debris or trash.

File revisions (1)