Supporting Documentation · Jun 12, 2025
SPRAB Report ZB 24 15 42 Eagle Ridge Way
9a0d3c080a0f655af97421dec88cf56d8437f00cda72532888470cad3efbea41Indexed text · page 3
Show all pages3 | Page 105 Grove Street, Suite 3 Montclair, NJ 07042 www.Nishuanegroup.com 973.954.2677 The applicant was asked if there will be a stormwater management system to minimize run-off to Llewlyn Park below. The applicant referred to the Stormwater Management Plan and noted that the proposed system will reduce run-off in compliance with the regulations…with a 50% reduction in run-off to that area. The Township Engineer recommended the inclusion of a rain garden to further mitigate run-off and embellish the landscape plan. The equine expert acknowledged that rain gardens are great. Only concern for the hippotherapy would be any standing water due to mosquito-born diseases. The Engineer also suggested a berm as an alternative to the rain garden. Sustainability: The applicant indicated that solar panels will be installed. Additionally, cisterns will be designed to connect with the roof drains, which are important to the efficiency of the hippotherapy component of the project. The applicant agreed to complete and submit the sustainability checklist. Scheduling: The applicant inquired about the next steps. The zoning officer indicated that the Board of Adjustment has a packed agenda and they will get them scheduled as soon as they have availability. Respectfully submitted, George Wheatle Williams, PP, AICP Principal, Nishuane Group, LLC. Erik DeLine, PP, AICP, LEED AP Associate, Nishuane Group, LLC.
File revisions (1)
- Sep 29, 2026
9a0d3c080a0f112,405 bytes