Supporting Documentation · May 7, 2025
Compiled PB Application Package w Exhibits 111 Prospect Avenue Orange Prospect LLC 2 19 25
4c6335328de1a5fa902afec8458e136898162d69cb5f8ffc6ba2e19e683179ffIndexed text · page 37
Show all pagesFrom: 10/10/2012 00:50 #437 P.015/050 buried and from Prospect Avenue, only floors 2 and 3 will be seen; and in the back floors 1 and 2 will be seen but the 3rd Floor will appear as a roof area with dormers so as to complement the area and the adjoining facility of The Manor. H. The proposed lot coverage, 51.3% exceeds the maximum permitted of 40% and the 51.3% maximum lot coverage also affects the steep slopes lot coverage requirement of 34.5% so as to involve a further use variance requirement. I. While the number of buildings ‘has been reduced to 1 the number of beds remains at 122 as approved by the Planning Board in a subsequent amended application. . a. The Applicant also seeks various "C" variances which include parking for 96 spaces instead of 122 spaces as required, a side yard setback contiguous’ to the residential zone (the golf course side) of 50 feet instead of 75 feet as required; a buffer to the residential district of 48.40 feet on the side and 73.82 feet in the rear instead of 75 feet as permitted; parking in the front yard of the hotel which is not permitted; and driveway distance to the residential area of 25 feet instead of 50 feet as required and permitting a free ‘standing sign to be erected that would be suitable to advertise the hotel and will comply with ail the requirements of the ordinance applicable to signs and will be substantially the same size as the existing Manor sign. K. The drainage system will be improved and the plans submitted and approved by the Engineering Department will accommodate the needs of the residents and prevent problems for
File revisions (1)
- Sep 29, 2026
4c6335328de19,295,843 bytes