Supporting Documentation · Jul 17, 2025
22 8 18 Bolivar 17 Wheatland West Orange Zoning Board Resolution exe
bc8f9686853d1a8937babd34934990702fb522b7b664d13d68aa00b003d4c7f1Indexed text · page 3
Show all pagestestified about the architectural floor plans and the elevation plans at the first meeting, and then testified about his revised plans of 7/2/22 which showed an unfinished basement with a utility room and a powder room, Mr. Baldanza was questioned about the need for a powder room in an unfinished basement, and the Applicant agreed to remove the powder room from the basement level; and WHEREAS, the Applicant presented the testimony of Shaun Delaney, a licensed professional civil engineer in the State of New Jersey, who was accepted by the Board as an expert in the field of civil engineering, Mr. Delaney testified that the Application conforms to the necessary setbacks for the zone, and that the plan calls for a retaining wall and a detention filtration system on the eastern side of the property, and indicated that the Applicant did not have a landscape plan or a tree replacement plan at which time the Applicant asked to be carried to the next hearing; and WHEREAS, Mr. Delaney continued his testimony at the next hearing, at which point he testified about the grading and landscape plan, a reduced size of the retaining wall from 7 % feet to 54% feet, and that this wall was pulled off the lot line and farther into the property, the wall will be constructed with modular block material, he discussed the trees slated to be removed and the quantity and size of the planned replacement trees; and 3 (00263426.D0C}
File revisions (1)
- Sep 29, 2026
bc8f9686853d2,645,996 bytes