Supporting Documentation · Jul 17, 2025
250701_42 ERW_Stormwater Report
bdfa016c460e03ce05ddc52cb7067d249c3e5525d506e2c3c9ddb7fc5338dbc9Indexed text · page 121
Show all pages40 Eagle Ridge Way PROJECT: TEST PIT: TP-01 PAGE 1 OF 1 LOCATION: West Orange, NJ 300 Tice Blvd., Suite 101, Woodcliff Lake, NJ 07677 GROUNDWATER: DEPTH (ft) N/E At Completion (0 hrs.) N/E DEPTH (ft.) 0 WATER SYMBOL First Encountered DATE GROUND ELEVATION (ft): ELEV. FROM: +/-622 Survey PROJECT NO. 24006174A CONTRACTOR: Grabowski Construction, Inc. EQUIPMENT: Excavator FIELD OBSERVER: FSD CHECKED BY: AHE DATE STARTED 02/18/25 DATE FINISHED 02/18/25 DESCRIPTION 10YR 3/6 Silt Clay Loam, 40% coarse fragments, subangular blocky, friable. (moist) 5 10 120" -10.0 END OF TEST PIT AT 120 INCHES 15 20 25 30 NOTES: Exposed soils at surface. Boulders encountered from the ground surface up to 10 ft below existing grades. Stone backfill encountered at 10 ft below existing grades. Test pit terminated at the request of the general contractor. TEST PIT: TP-01 Perched Water Conditions - Not Encountered Est. Seasonal High Groundwater - Not Detected Form: CED-TP-GeoReport-No Remarks-R2.fdt 3/10/2022 PAGE 1 OF 1 Data File:
File revisions (1)
- Sep 29, 2026
bdfa016c460e15,878,530 bytes