Supporting Documentation · Jul 17, 2025
250701_42 ERW_Stormwater Report
bdfa016c460e03ce05ddc52cb7067d249c3e5525d506e2c3c9ddb7fc5338dbc9Indexed text · page 97
Show all pagesProject Name Waymaker Description Proposed Site Improvements Recharge BMP Input Parameters Parameter BMP Area BMP Effective Depth, this is the design variable Upper level of the BMP surface (negative if above ground) Depth of lower surface of BMP, must be>=dBMPu Post-development Land Segment Location of BMP , Symbol Analysis Date 07/01/25 BMP or LID Type Subsurface Infiltration Basin Root Zone Water capacity Calculated Parameters Value Unit ABMP 4708.0 sq.ft dBMP 3.6 in dBMPu 108.0 in dEXC 117.0 in SegBMP 2 Parameter Empty Portion of RWC under Post-D Natural Recharge ERWC Modified to consider dEXC Empty Portion of RWC under Infilt. BMP Symbol Value Unit Recharge Design Parameters Parameter Symbol Value Unit Qdesign 1.61 in Pdesign 1.83 in ERWC 0.61 in Inches of Runoff to capture EDRWC 0.00 in Inches of Rainfall to capture RERWC 0.00 in Recharge Provided Avg. over Imp. Area 35.8 in Runoff Captured Avg. over imp. Area 35.8 in unitless Input Zero if Location is distributed or undetermined BMP Calculated Size Parameters ABMP/Aimp BMP Volume Aratio VBMP CALCULATION CHECK MESSAGES 0.42 unitless 1,412 cu.ft Parameters from Annual Recharge Worksheet System Performance Calculated Parameters Post-D Deficit Recharge (or desired recharge volume) Vdef Annual BMP Recharge Volume Post-D Impervious Area (or target Impervious Area) Aimp 11,326 sq.ft Root Zone Water Capacity RWC 3.69 in RWC Modified to consider dEXC DRWC 0.00 in Climatic Factor C-factor 1.67 no units Average Annual P Pavg 49.0 in 28,650 cu.ft Avg BMP Recharge Efficiency %Rainfall became Runoff %Runoff Infiltrated %Runoff Recharged %Rainfall Recharged Volume Balance-> Solve Problem to satisfy Annual Recharge dBMP Check---> OK dEXC Check---> OK 33,755 cu.ft 100.0% 78.5% 93.0% 28.5% 22.4% BMP Location---> OK Represents % Infiltration OTHER NOTES Recharged % Pdesign is accurate only after BMP dimensions are updated to make rech volume= deficit volume. The portion % of BMP infiltration prior to filling and the area occupied by BMP are ignored in these calculations. Results are % sensetive to dBMP, make sure dBMP selected is small enough for BMP to empty in less than 3 days. For land % Segment Location of BMP if you select "impervious areas" RWC will be minimal but not zero as determined by Recharge
sure dBMP selected is small enough for BMP to empty in less than 3 days. For land % Segment Location of BMP if you select "impervious areas" RWC will be minimal but not zero as determined by Recharge Requirement dr in 9.3 the soil type and a shallow root zone for this Land Cover allowing consideration of lateral flow and other losses. over Imp. Area How to solve for different recharge volumes: By default the spreadsheet assigns the values of total deficit recharge volume "Vdef" and total proposed impervious area "Aimp" from the "Annual Recharge" sheet to "Vdef" and "Aimp" on this page. This allows solution for a single BMP to handle the entire recharge requirement assuming the runoff from entire impervious area is available to the BMP. To solve for a smaller BMP or a LID-IMP to recharge only part of the recharge requirement, set Vdef to your target value and Aimp to impervious area directly connected to your infiltration facility and then solve for ABMP or dBMP. To go back to the default configuration clik the "Default Vdef & Aimp" button.
File revisions (1)
- Sep 29, 2026
bdfa016c460e15,878,530 bytes