Supporting Documentation · Jul 17, 2025
250701_JF_Response Letter
6ccb205e1cf1fa6fd52eb42ec85bb00547d500e87cdd422b3cc56b5fea0fa54dIndexed text · page 3
Show all pagesProject No. 24006174A July 1, 2025 Page 3 | 5 3.2. Steep slope calculations are required as per Section 25-28 of the Land Use Regulations. The plan shall comply with the provisions of the Ordinance. Response: Steep slope calculations are included in this submission. 3.3. Modular block walls are proposed in the easterly portion of the site. The plan and detail indicates the walls will not exceed four feet in height. A building permit is not required for a wall four feet or less in height, however a global stability analysis with supporting calculations shall be submitted by the Engineer to ensure that the wall can sustain the proposed wall loadings. Response: A global stability analysis will be submitted prior to final approval. 3.4. The Engineer shall prepare a plan superimposing existing and proposed contours in color to clearly show the differences between the two sets of contours. Response: The grading plan shows the existing contours in a light grey and the proposed contours in black. 3.5. Soil movement calculations within the limit of Disturbance shall be provided by the Engineer. Response: Soil movement calculations are included in this submission. 3.6. The Engineer shall provide information on the types of vehicles that will frequent this Site and how those vehicles will maneuver within the Property. Response: Testimony regarding vehicles frequenting the site will be provided to the Board. 3.7. Waste disposal, particularly horse waste shall be addressed. A dumpster is depicted along the southerly elevation of the structure, but information is required on how this dumpster will be used along with frequency of collection and vehicle maneuverability. Response: Testimony regarding waste disposal will be provided to the Board. 3.8. A detail of the Proposed Pavement (Typ.) is required. Response: A proposed pavement detail has been added to the plans. 3.9. The Engineer shall determine if any of the proposed improvements encroach on wetlands or wetlands buffers that exist along the westerly side of Eagle Ridge Way opposite this site. Response: Per the drawing titled Condominium Map for The Pointe at Crystal Lake, dated April 14, 2000, prepared by Langan Engineering and Environmental Sciences, the wetlands and wetlands buffer located on the property on the northern side of Eagle Ridge Way is contained fully on that property. No wetlands or wetlands buffers
eering and Environmental Sciences, the wetlands and wetlands buffer located on the property on the northern side of Eagle Ridge Way is contained fully on that property. No wetlands or wetlands buffers extend onto the subject property.
File revisions (1)
- Sep 29, 2026
6ccb205e1cf1121,705 bytes