Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 17, 2025

250701_JF_Response Letter

Preserved file SHA-2566ccb205e1cf1fa6fd52eb42ec85bb00547d500e87cdd422b3cc56b5fea0fa54d

Indexed text · page 5

Show all pages
Page 5

Project No. 24006174A July 1, 2025 Page 5 | 5 4.8. The Engineer shall provide documentation from the manufacturer of the storage chambers that the storage volume per chamber is as specified. Response: The manufacturer’s cut sheet is included in the stormwater management report. 4.9. Conveyance system calculations are required. Response: Pipe sizing calculations are included in this submission. 5. Landscaping Plan 5.1 Matrix has no comment on the landscaping plan. Response: Statement of fact. 6. Soil Erosion & Sediment Control 6.1. The Applicant shall obtain a soil erosion and sediment control permit from the Hudson-Essex- Passaic Soil Conservation District. Matrix reserves the right to review the certification and approved plans from the district. Response: A permit from the HEP SCD will be obtained after Zoning Board approval and prior to the start of construction. Should you have any questions, please do not hesitate to contact our office. Sincerely, Colliers Engineering & Design, Inc. Justin Ferrazzano Senior Project Manager R:\Projects\2024\24006174A\Correspondence\OUT\250630_JF_Response Letter.docx

File revisions (1)