Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 18, 2025

Drainage Report and Supplement 82625

Preserved file SHA-256bcd98012577ef8ed87fe6b7b9ec8a3a82b402972e6f63512bceb3552d68204a5

Indexed text · page 5

Show all pages
Page 5

CONCLUSION The designer believes that the proposal complies with the provisions of the Stormwater Management Ordinance, reduces stormwater runoff to adjacent properties and public roads and does not create increased demand on the public drainage system. ENCLOSURES Appendix 1: Drainage Runoff Calculations Output Existing Drainage Areas Plan Proposed Conditions Drainage Areas Plan Proposed Piping Calculation Plan Page 4.

File revisions (1)