Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 18, 2025

25 09 12 MPB Realty Planning Review 3

Preserved file SHA-256fdc1d220d585835627e192aadcc54e608bc0a3739239b17fab2f834ee8f813af

Indexed text · page 11

Show all pages
Page 11

West Orange Zoning Board September 12, 2025 Re: MPB Realty (Popeyes & IHOP) Our File No. WRZ0153.V01 Planning Review #3 Page 11 S:\West Orange\Zoning Board\VWRZ0153.01 - MPB Realty, LLC\25-09-12 MPB Realty - Planning Review 3.docx 7. Materials Submitted The following materials have been submitted and reviewed in association with this application: • Application form and submission checklists dated July 1, 2024; • Two (2) page application cover letter from Jason Tuvel, Esq. dated August 12, 2024; • Twenty-one (21) sheet set of site plan drawings prepared by Dynamic Engineering, dated June 7, 2024, last revised August 22, 2025; • Two (2) sheet set of architectural drawings prepared by G 141 Architecture, dated June 12, 2024; • Acoustical Evaluation report, prepared by Lewis S. Goodfriend & Associates, dated June 17, 2024, revised February 3, 2025; • Drainage statement for subject property, prepared by Dynamic Engineering, dated June 2024; • Environmental Impact Statement, prepared by Dynamic Engineering, dated June 2024, revised February 2025; • Stormwater Management Operation and Maintenance Manual, prepared by Dynamic Engineering, dated June 2024; • Traffic Impact Study, prepared by Dynamic Traffic, dated October 21, 2022, last revised June 4, 2024; • Variance & Waiver Request List, prepared by Dynamic Engineering, dated June 7, 2024; • Planning Report and Justification for Variances, prepared by Dresdner Robin, dated August 2, 2024, revised to September 5, 2025; • Tree Removal Report, prepared by Dynamic Engineering, dated June 2024, revised February 2025; • Solid Waste Management Plan, prepared by Dynamic Engineering, dated June 7, 2024; • Copy of Resolution PB-97-18, dated October 8, 1997; • Copy of Resolution dismissing previous application without prejudice, dated March 21, 2024; • One (1) sheet survey drawing prepared by Dynamic Survey, LLC, dated May 13, 2021 • Eight (8) page response letter prepared by Dynamic Engineering, dated September 8, 2025;

File revisions (1)