Geotechnical Engineering Report 12 10 2024 submission
1c1a06e906baf7819137bbabdc0c5687d4ca7f932871028f567f77adf5570ff2Indexed text · page 19
Show all pagesMavis Store #2296 December 10, 2024 ECS Project No. 44:2100 Page 15 Bedding material should be placed up to at least the springline of the pipe unless otherwise required by civil/site engineer, pipe manufacturer, or documented industry standard. Fill placed for support of the utilities, as well as backfill over the utilities, should satisfy the requirements for Structural Fill. Utility Excavation Dewatering: It is possible that water may be encountered within utility excavations which extend below existing grades. It is anticipated that removal of water which seeps into utility excavations can be accomplished by pumping from sumps excavated into the trench bottom. Should water conditions beyond the capability of sump pumping be encountered, the contractor should prepare and submit a Dewatering Plan.