Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

Geotechnical Engineering Report 12 10 2024 submission

Preserved file SHA-2561c1a06e906baf7819137bbabdc0c5687d4ca7f932871028f567f77adf5570ff2

Indexed text · page 20

Show all pages
Page 20

Mavis Store #2296 December 10, 2024 ECS Project No. 44:2100 Page 16 6.0 CLOSING ECS has prepared this report to guide the geotechnical-related design and construction aspects of the project. We performed these services in accordance with the standard of care expected of professionals in the industry performing similar services on projects of like size and complexity at this time in the region. No other representation, expressed or implied, and no warranty or guarantee is included or intended in this report. The description of the proposed project is based on information provided to ECS by Mavis. If any of this information is inaccurate or changes, either because of our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted so we can review our recommendations and provide additional or alternate recommendations that reflect the proposed construction. We recommend that ECS review the project plans and specifications so we can confirm that those plans/specifications are in accordance with the recommendations of this geotechnical report. Field observations, and quality assurance testing during earthwork and foundation installation are an extension of, and integral to, the geotechnical design. We recommend that ECS be retained to apply our expertise throughout the geotechnical phases of construction, and to provide consultation and recommendation should issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report.

File revisions (1)