Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

Geotechnical Engineering Report 12 10 2024 submission

Preserved file SHA-2561c1a06e906baf7819137bbabdc0c5687d4ca7f932871028f567f77adf5570ff2

Indexed text · page 34

Show all pages
Page 34

CLIENT: PROJECT NO.: BORING NO.: SHEET: Mavis Tire Supply, LLC 44:2100 B-02 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: Mavis #2296 - West Orange, NJ Sano Drilling SITE LOCATION: LOSS OF CIRCULATION 460 Prospect Avenue, West Orange, New Jersey, 07054 LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION: BOTTOM OF CASING 40.791515 -74.254288 618.0 STANDARD PENETRATION BLOWS/FT (TCP/MC/SPT-N value)* LIQUID LIMIT

Page 34

LIQUID LIMIT PLASTIC LIMIT SAMPLE NUMBER 10 20 30 40 50 SAMPLE DIST. (IN) ELEVATION (FT) RECOVERY (IN) WATER LEVELS 20 40 60 80 100 SAMPLE TYPE DEPTH (FT) ROCK QUALITY DESIGNATION & RECOVERY BLOWS/6" CALIBRATED PENETROMETER RQD TSF

Page 34

RQD TSF DESCRIPTION OF MATERIAL REC 1 2 3 4 5 MC SAMPLER BLOWS/FT WATER CONTENT % [FINES CONTENT] % 10 20 30 40 50 10 20 30 40 50 TEXAS CONE PENETRATION BLOWS/FT Asphalt Thickness[6.00"] 49-21-50/1" S-1 SS 13 8 (SM PROBABLE FILL) PROBABLE FILL, (71/7") 71/7" S-2 SS 0 0 SILTY SAND WITH GRAVEL, gray, moist,

Page 34

(71/7") 71/7" S-2 SS 0 0 SILTY SAND WITH GRAVEL, gray, moist, 50/0" 50/0" very dense (50/0") (NO RECOVERY), PROBABLE FILL (ML/CL) CLAYEY SILT, reddish brown, 4-6-7-6 5 S-3 SS 24 14 moist, s to very s 613 (13) 12.5 13 5-6-10-10 S-4 SS 24 14 (16) 12.1 16 (ML) SILT, reddish brown, moist, 10-16-14-16 S-5 SS 24 12 medium dense (30)

Page 34

6-14-16 S-5 SS 24 12 medium dense (30) 30 10 608 (WR) WEATHERED ROCK SAMPLED AS 8-50/3" S-6 SS 9 6 10.3 (50/3") 50/3" SILTY SAND WITH GRAVEL, dark brown 15 [Weathered ROCK] 603 END OF BORING AT 15.0 FT 20 598 25 593 30 588 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered) Dry BORING STARTED: Nov

Page 34

PES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered) Dry BORING STARTED: Nov 22 2024 CAVE IN DEPTH: WL (Comple on) Dry BORING Nov 22 2024 HAMMER TYPE: Auto WL (Seasonal High Water) COMPLETED: EQUIPMENT: LOGGED BY: WL (Stabilized) DRILLING METHOD: Hollow Stem Auger Diedrich D-50 LJK1 GEOTECHNICAL BOREHOLE LOG

File revisions (1)