Supporting Documentation · May 28, 2026
Geotechnical Engineering Report Addendum No 1 Results of Testing 01 29 2025 submission
28bb996689501483d1d8b722cf1ba5cac10a6dddb28205b7927653fdf835c6ceIndexed text · page 20
Show all pagesPhotograph 1 (Top left): TP-01: Sprinkler system, wires, roots between 0.5 and 1.5 feet below ground surface. Photograph 2 (Top right): TP-01: Metal nails encountered between 0.5 and 1.5 feet below ground surface. Photograph 3 (Bottom left): TP-02: Sprinkler system and brick encountered between 0.25 and 3.25 feet below ground surface . Mavis #2296 – Additional Infiltration Testing SELECT PROJECT PHOTOGRAPHS 460 Prospect Avenue West Orange, NJ ECS Project 44:2100-A January 23, 2025 Mavis Tire Supply, LLC
File revisions (1)
- Sep 29, 2026
28bb996689508,026,368 bytes