Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

Traffic Impact Study 07 21 2025 submission

Preserved file SHA-256b1a9a72df7c7de2c8b92b634347f763b42defbf6280a560147a1346b88638e58

Indexed text

Page 51

1956 24-04212 No Build-SAT 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 228 0 232 1 3 4 237 360 11 3 401 246 Future Volume (vph) 228 0 232 1 3 4 237 360 11 3 401 246 Ideal Flow (vphpl) 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 Lane Width (ft) 12 12 12 10 10 10 10 10 10 13 11 12 Grade (%) 2% -2% -3% 3% Storage Length (ft) 0 0 0 0 100 0 0 0 Storage Lanes 1 0 0 0 1 0 0 1 Taper Length (ft) 25 25 75 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00 Ped Bike Factor 0.94 1.00 1.00 0.97 Frt 0.850 0.932 0.995 0.850 Flt Protected 0.950 0.994 0.950 Satd. Flow (prot) 1955 1636 0 0 1834 0 1890 3725 0 0 3762 1758 Flt Permitted 0.950 0.994 0.457 0.953 Satd. Flow (perm) 1955 1636 0 0 1833 0 906 3725 0 0 3585 1710 Right Turn on Red Yes No Yes No Satd. Flow (RTOR) 763 5 Link Speed (mph)

Page 51

No Yes No Satd. Flow (RTOR) 763 5 Link Speed (mph) 25 25 40 40 Link Distance (ft) 277 225 325 94 Travel Time (s) 7.6 6.1 5.5 1.6 Confl. Peds. (#/hr) 2 2 4 4 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 1% 0% 1% 0% 0% 0% 0% 1% 0% 0% 1% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 243 247 0 0 8 0 252 395 0 0 430 262 Turn Type Prot NA Perm NA pm+pt NA Perm NA pm+ov Protected Phases 4 10 5 2 6 4 Permitted Phases 10 2 6 6 Detector Phase 4 10 10 5 2 6 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 9.0 9.0 9.0 5.0 Minimum Split (s) 10.0 10.0 10.0 8.0 15.0 15.0 15.0 10.0 Total Split (s) 29.0 12.0 12.0 19.0 49.0 30.0 30.0 29.0 Total Split (%) 32.2% 13.3% 13.3% 21.1% 54.4% 33.3% 33.3% 32.2% Maximum Green (s) 24.0 7.0 7.0 16.0 43.0 24.0 24.0 24.0 Yellow Time (s) 3.0 3.0 3.0 3.0 4.0 4.0 4.0 3.0 All-Red Time (s) 2.0 2.0 2.0 0.0

Page 51

s) 3.0 3.0 3.0 3.0 4.0 4.0 4.0 3.0 All-Red Time (s) 2.0 2.0 2.0 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 3.0 6.0 6.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Recall Mode None None None None Max Max Max None Walk Time (s) 7.0 9.0 9.0 9.0 7.0 Flash Don't Walk (s) 17.0 15.0 15.0 15.0 17.0 Pedestrian Calls (#/hr) 4 2 0 0 4 Act Effct Green (s) 13.7 0.0 5.4 46.7 43.7 31.8 46.5 Actuated g/C Ratio 0.19 0.00 0.08 0.66 0.62 0.45 0.66 DJR Synchro 12 Report 07/21/2025 Lanes, Volumes, Timings

Page 52

1956 24-04212 No Build-SAT 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR v/c Ratio 0.64 0.32 0.06 0.35 0.17 0.27 0.23 Control Delay (s/veh) 34.3 1.1 35.4 7.9 7.4 15.5 4.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 34.3 1.1 35.4 7.9 7.4 15.5 4.9 LOS C A D A A B A Approach Delay (s/veh) 17.6 35.4 7.6 11.5 Approach LOS B D A B Queue Length 50th (ft) 93 0 3 30 28 51 22 Queue Length 95th (ft) 184 0 19 121 92 148 99 Internal Link Dist (ft) 197 145 245 14 Turn Bay Length (ft) 100 Base Capacity (vph) 678 763 185 829 2317 1622 1140 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.36 0.32 0.04 0.30 0.17 0.27 0.23 Intersection Summary Area Type:

Page 52

0 0 Reduced v/c Ratio 0.36 0.32 0.04 0.30 0.17 0.27 0.23 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 70.3 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.64 Intersection Signal Delay (s/veh): 11.9 Intersection LOS: B Intersection Capacity Utilization 63.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway DJR Synchro 12 Report 07/21/2025 Lanes, Volumes, Timings

Page 53

1956 24-04212 Build-AM 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 172 0 121 2 1 0 109 305 0 7 438 255 Future Volume (vph) 172 0 121 2 1 0 109 305 0 7 438 255 Ideal Flow (vphpl) 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 Lane Width (ft) 12 12 12 10 10 10 10 10 10 13 11 12 Grade (%) 2% -2% -3% 3% Storage Length (ft) 0 0 0 0 100 0 0 0 Storage Lanes 1 0 0 0 1 0 0 1 Taper Length (ft) 25 25 75 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00 Ped Bike Factor 0.94 1.00 1.00 0.97 Frt 0.850 0.850 Flt Protected 0.950 0.968 0.950 0.999 Satd. Flow (prot) 1881 1620 0 0 1916 0 1890 3670 0 0 3652 1691 Flt Permitted 0.950 0.968 0.450 0.949 Satd. Flow (perm) 1881 1620 0 0 1908 0 892 3670 0 0 3469 1644 Right Turn on Red Yes No Yes No Satd. Flow (RTOR) 596 Link Speed (mph) 25

Page 53

n on Red Yes No Yes No Satd. Flow (RTOR) 596 Link Speed (mph) 25 25 40 40 Link Distance (ft) 277 225 325 94 Travel Time (s) 7.6 6.1 5.5 1.6 Confl. Peds. (#/hr) 2 2 4 4 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 5% 0% 2% 0% 0% 0% 0% 3% 0% 0% 4% 4% Shared Lane Traffic (%) Lane Group Flow (vph) 185 130 0 0 3 0 117 328 0 0 479 274 Turn Type Prot NA Perm NA pm+pt NA Perm NA pm+ov Protected Phases 4 10 5 2 6 4 Permitted Phases 10 2 6 6 Detector Phase 4 10 10 5 2 6 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 9.0 9.0 9.0 5.0 Minimum Split (s) 10.0 10.0 10.0 8.0 15.0 15.0 15.0 10.0 Total Split (s) 17.0 12.0 12.0 10.0 61.0 51.0 51.0 17.0 Total Split (%) 18.9% 13.3% 13.3% 11.1% 67.8% 56.7% 56.7% 18.9% Maximum Green (s) 12.0 7.0 7.0 7.0 55.0 45.0 45.0 12.0 Yellow Time (s) 3.0 3.0 3.0 3.0 4.0 4.0 4.0 3.0 All-Red Time (s) 2.0 2.0 2.0 0.0 2.0

Page 53

3.0 3.0 3.0 3.0 4.0 4.0 4.0 3.0 All-Red Time (s) 2.0 2.0 2.0 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 3.0 6.0 6.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Recall Mode None None None None Max Max Max None Walk Time (s) 7.0 9.0 9.0 9.0 7.0 Flash Don't Walk (s) 17.0 15.0 15.0 15.0 17.0 Pedestrian Calls (#/hr) 4 2 0 0 4 Act Effct Green (s) 13.1 0.0 5.2 60.6 57.6 50.2 64.3 Actuated g/C Ratio 0.16 0.00 0.06 0.72 0.69 0.60 0.77 DJR Synchro 12 Report 07/21/2025 Lanes, Volumes, Timings

Page 54

1956 24-04212 Build-AM 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR v/c Ratio 0.63 0.22 0.03 0.16 0.13 0.23 0.22 Control Delay (s/veh) 42.3 0.8 41.0 5.7 6.0 10.2 2.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 42.3 0.8 41.0 5.7 6.0 10.2 2.8 LOS D A D A A B A Approach Delay (s/veh) 25.2 41.0 5.9 7.5 Approach LOS C D A A Queue Length 50th (ft) 86 0 1 12 22 52 18 Queue Length 95th (ft) 166 0 11 57 75 138 70 Internal Link Dist (ft) 197 145 245 14 Turn Bay Length (ft) 100 Base Capacity (vph) 317 596 161 730 2527 2082 1272 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.58 0.22 0.02 0.16 0.13 0.23 0.22 Intersection Summary Area Type:

Page 54

0 0 Reduced v/c Ratio 0.58 0.22 0.02 0.16 0.13 0.23 0.22 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 83.6 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.63 Intersection Signal Delay (s/veh): 10.8 Intersection LOS: B Intersection Capacity Utilization 52.8% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway DJR Synchro 12 Report 07/21/2025 Lanes, Volumes, Timings

File revisions (1)