Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

Traffic Impact Study 07 21 2025 submission

Preserved file SHA-256b1a9a72df7c7de2c8b92b634347f763b42defbf6280a560147a1346b88638e58

Indexed text · page 52

Show all pages
Page 52

1956 24-04212 No Build-SAT 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR v/c Ratio 0.64 0.32 0.06 0.35 0.17 0.27 0.23 Control Delay (s/veh) 34.3 1.1 35.4 7.9 7.4 15.5 4.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 34.3 1.1 35.4 7.9 7.4 15.5 4.9 LOS C A D A A B A Approach Delay (s/veh) 17.6 35.4 7.6 11.5 Approach LOS B D A B Queue Length 50th (ft) 93 0 3 30 28 51 22 Queue Length 95th (ft) 184 0 19 121 92 148 99 Internal Link Dist (ft) 197 145 245 14 Turn Bay Length (ft) 100 Base Capacity (vph) 678 763 185 829 2317 1622 1140 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.36 0.32 0.04 0.30 0.17 0.27 0.23 Intersection Summary Area Type:

Page 52

0 0 Reduced v/c Ratio 0.36 0.32 0.04 0.30 0.17 0.27 0.23 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 70.3 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.64 Intersection Signal Delay (s/veh): 11.9 Intersection LOS: B Intersection Capacity Utilization 63.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway DJR Synchro 12 Report 07/21/2025 Lanes, Volumes, Timings

File revisions (1)